My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4777
>
Resolutions
>
Resolution 4777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 9:50:50 AM
Creation date
3/9/2017 9:50:31 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4777
Date
6/30/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
411.1 In <br /> Washington State Department of Transportation Page 6 Six Year Transportation Improvement Program <br /> -en <br /> Agency Everett From 2000 to 2005 <br /> County No. 31 Hearing Date 6/23/99 <br /> --- <br /> City No. 04210 Adoption Date 6/23/99 - ------ <br /> MPO PSRC Resolution No. - <br /> Project Identification P-roject Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. z Fund Source Information Expenditure Schedule Projects Only <br /> m B. Bridge No. E�, h it a —__— (Local Agency) _ <br /> E H 4 C. Project Title a n = , u. Federal Funding RNV <br /> ''u '_e o 5 D. Street/County Road Name or Number n� y = Phase Federal Federal State 4th Required <br /> c v > o a Pro ed State Local Total Envir. <br /> i ti z E. Beginning MP or road- Ending MP or road E Phase Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type Date <br /> F. Describe Work to be Done (mm/ddyyyy) Code Phase Code 6th T (Miivyy) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 17 7 3 Phases in Project 05 P 0.4 C PE 1/1/2002 • <br /> • P <br /> RW 4/1/2002 Yes <br /> 52nd Street SE Improvements . T CN 7/1/2002 250 I 50 300 300 <br /> 52nd Street SE o <br /> Colby Avenue to Evergreen Way <br /> Design and Construct Road Widening and Pedestrian Totals 250 50 300 300 <br /> 17 8 2 Phases in Project '. 05 P 0.1 C PE 1/1/2002 1 <br /> P CN 4/1/2002 ", 200 40 2401 240 - -No 16th Street Improvements T <br /> 16th Street O <br /> Maple Street to Walnut Street <br /> Design and Construct Road Widening,Intersection Improv., Totals 200 40 240 240 <br /> 19 1 2 Phases in Project 07 S PE 1/1/2000 O CN 7/1/2000 STP 270 ,I, 10500 107701 1500 1735 1835• 5700 CE No <br /> ' Annual Street Overlay Program <br /> Various Streets within the City Limits <br /> Various Streets to Various Streets <br /> Resurfacing Streets Totals 270 10500 10770 1500 1735 1835 5700 <br /> 19 2 2 Phases in Project 06 Sli 00 ' C PE 1/12000 ---- I <br /> CN • 5/1/2000 2400 24001 400 400 400 1200 No <br /> P � <br /> Neighborhood Traffic Mitigation ProjectsT <br /> Various Locations within the City Limits ' 0 <br /> Various Streets to Various Streets <br /> Install Traffic Enhancements in Neighborhoods ! Totals 2400 2400 400 400 400 1200 <br /> 19 3PE 1/1/2000 2 Phases in Project 06 P I 00 O CN I, 6/1/2000 • I� 360, 3601 60'i 60 60 180 No <br /> Pedestrian Improvements(City-wide) <br /> Various Locations within the City Limits <br /> Various Streets to Various Streets _ ' <br /> Design and Construct New and Rehab.Existing Sidewalks, Totals 360 360 60 60 60 180 <br /> 19 4 2 Phases in Project 06 S 00 C CN ' 5/1/2000 360 3601 60 60'. 60 180 No <br /> P <br /> Neighborhood Block Grants 1 I T <br /> Various Locations within the City Limits I I I0 <br /> Various Streets to Various Streets <br /> Construct Public Street Improvements in Various Totals 360 360 60 60 60 180 <br /> 19 5 1 Phases in Project 12 S 00 C CN 5/1/2000 240 2401 40 40 40 120 _-- <br /> P No <br /> Traffic Signal Interconnect T <br /> Various Locations within the City Limits <br /> Various Locations to Various Locations <br /> Construct Traffic Signal Interconnect Totals 240 240 40 40 40 120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.