My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4777
>
Resolutions
>
Resolution 4777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 9:50:50 AM
Creation date
3/9/2017 9:50:31 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4777
Date
6/30/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alik <br /> Washington State Department of Transportation Page 7 Six Year Transportation Improvement Program <br /> Agency Everett From 2000 to 2005 <br /> County No. 31 Hearing Date 6/23/99 <br /> City No. 0420_ Adoption Date 6/23199 <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. C' E. m -- -- _ - - - --- -- - - -.- ---_--- -. - Expenditure Schedule Projects Only <br /> E. w Fund Source Information Pro1 <br /> m B. Bridge No. E m c c (Local Agency) ___ _ <br /> E, H �a C. Project Title s 8 C Federal Funding RAN <br /> t o o E D. Street/County Road Name or Number n� H 3 - Phase Federal Federal State 4th Required <br /> o :Ti Project State Local Total Envir. <br /> i 0-z E. Beginning MP or road- Ending MP or road E t- m Phase Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MAV" <br /> �a <br /> F. Describe Work to be Done (mm/ddyyyy) Code Phase Code 6th <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 6 2 Phases in Project 12 S 00 O PE 1/1/2000 'CN 5/1/2000 200 200 50 50 50 50 No <br /> Pavement Marking Projects <br /> Various Streets within the City Limits <br /> Various Streets to Various Streets <br /> Install Pavement Marking in Various Locations I I Totals 200 200 50 50 50 50 <br /> 19 7 2 Phases in Project 12 S 00 C PE 1/12000 ---- <br /> P CN 6/1/2000 '. 900 900 150 150' 150 450 No <br /> Traffic Signal Improvements(City-wide) T <br /> Various Locations within the City Limits <br /> Various Streets to Various Streets <br /> Design/Construct/Install Interim Traffic Signals Totals 900 900 150 150 150 450 <br /> 19 8 2 Phases in Project 12 S 00---C PE 3/1/2000 i - <br /> P CN 9/1/2000 600, 6001 600 No <br /> • <br /> Developer Traffic Signals T <br /> Various Locations within the City Limits <br /> Various Streets to Various Streets <br /> Design/Construct/Install Developer Traffic Signals Totals 600 600 600 <br /> 19 9 2 Phases in Project 12 S 00 C PE 7/1/99 STP(S) CE <br /> CN 3/1/2000 STP(S)' 261 I 29 2901-290 <br /> P No <br /> Hazard Elimination and Safety(HES)Projects T <br /> Various Streets within the City Limits <br /> EMW,Broadway,Colby to Others <br /> I Construct Hazard Elimination and Safety Projects Totals 261 29 290 290 <br /> 19 10 ' 1 Phases in Project 12 P 00 C <br /> CN 6/12000 120 120 20. 20' 20: 60 <br /> P No <br /> Roadway Hazard Elimination Projects(City-wide) T <br /> Various Streets within City Limits O <br /> Various Streets to Various Streets <br /> Remove and/or Modify Roadside Hazards Totals 120 120 20 20 20 60 <br /> 19 11 1 Phases in Project 31 p 00 PE 2/1/2000 70, 701 70 ' <br /> No <br /> Neighborhood Traffic Studies <br /> Port Gardner,Northwest,and Other Neighborhoods <br /> Various Streets to Various Streets <br /> Study Traffic Trends and Recommend Improvements Totals 70 70 70 <br /> 19 12 4 Phases in Project 32 S 2.0 P PE 3/1/98CE <br /> RW ' 9/1/99 Yes <br /> O CN 6/1/2000 CMAQ 400 170 570 570 <br /> Northern Extension of the Interurban Trail,Stage II CN 4/1/2000 STP(E) 310 45 355 355 <br /> Commercial Ave.,PUD RNV,Colby Ave. 3/1/99 <br /> Madison Street to 41st Street <br /> Design and Construct Pedestrian/Bicycle Path Totals 710 215 925 925 <br />
The URL can be used to link to this page
Your browser does not support the video tag.