My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4777
>
Resolutions
>
Resolution 4777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 9:50:50 AM
Creation date
3/9/2017 9:50:31 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4777
Date
6/30/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 Six Year Transportation Improvement Program <br /> -enWashington State Department of Transportation <br /> Agency Everett From 2000 to 2005 <br /> County No. 31 Hearing Date 6/23/99 <br /> City No. 0420 Adoption Date 6/23/99 <br /> MPO PSRC_ Resolution No. '- <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. t m Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. v (Local Agency) <br /> To H z'21 C. Project Title ;a v Federal Funding RAN <br /> '6 o E D. Street/County Road Name or Number o r= w 3 D Phase Federal Federal State 4th Required <br /> c v > o a Project State Local Total Envir. <br /> ti a`z E. Beginning MP or road- Ending MP or road E r- F Phase Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru TypeDate <br /> F. Describe Work to be Done (mm/ddyyyy) Code Phase Code 6th (MW' <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 11 8 3 Phases in Project 04 P '�� 0.2 O PE 6/1/98 <br /> 96/1 RW 6/1/99 Yes <br /> 1-5/SR 96 Interchange CN 10/112000 11000 900 11900 2000 8950 <br /> 128th Street SE(SR 96)and 1-5 <br /> 1-5 at SR 96 Interchange to 1-5 at SR 96 Interchange <br /> Design and Construct Interchange Loop Ramps,HOV Totals 11000 900 11900 2000 8950 <br /> 12 1 BR 0002(171) --- 4 Phases in Project 09 , S 0.1 0 PE 11/1/97 300 300 • <br /> 2/5S,2/5T - RW 1/1/98 Yes <br /> , TIA 1615 315 1930 1700 <br /> US 2 Snohomish River Bridge Widening(3rd Lane) CN 3/1199 CN 3/1199 1000 1000 1000 <br /> US 2 <br /> EB US 2 Sno.Riv.Br. to EB US 2 Sno.Riv.Br. <br /> Construct 3rd Lane on EB US 2 Bridge over Snoh.River j Totals 2615 615 3230 2700 <br /> 12 2 2 Phases in Project 05 ! P 3.2 P PE 5/1/2002 <br /> various 0 CN 2/1/2004 25000 2500012500' 22500 No <br /> SR 526 HOV Lane <br /> SR 526 <br /> 1-5 to 34th Ave.W <br /> Design and Construct Permanent NOV Lane(s) Totals 25000 25000 2500 22500 <br /> 12 3 --- 1 Phases in Project 31 P 00 �� PE I 9/1/2000 ! 1 250 250 250', <br /> 526/14 No <br /> SR 526/Hardeson Road Interchange Study <br /> SR 526 and Hardeson Road <br /> SR 526/Hardeson Road to SR 526/Hardeson Road <br /> Study Possible Interchange Improvements 1 Totals 250 250 250 <br /> 14 1 4 Phases in Project 04 P 1.0 ' C PE 3/1/94 I,. <br /> RW 7/1/98 Yes <br /> 19th Avenue SE(SR 527)Improvements . • <br /> r CN 6/1/2000 TIAL, 6584 1216. 7800 2770 3400 <br /> T CN 6/1/2000 9830 9830 49151 4915! <br /> 19th Avenue SE O <br /> 112th Street SE to 132nd Street SE <br /> Design and Construct Add.Lanes,Signal Improv.,etc. Totals 16414 1216 17630 7685 8315 <br /> 14 2 HP-1998(021) 4 Phases in Project 04 S 1.5 C PE 5/1/99 DEMO 732 183 915 EA <br /> P RW 9/1/99 DEMO 592 148 740 4001 Yes <br /> CN 4/1/2000 DEMO 3576 269 3845 4445 <br /> East Marine View Drive Improvements T CN600 600 <br /> East Marine View Drive 0 6/1/99 <br /> North Broadway to 1-5 <br /> Design and Construct Roadway Widening and Improvements ' Totals 4900 600 600 6100 4845 <br /> 14 3 4 Phases in Project 08 S 0.1 C PE 5/1/99 2810 2810 <br /> m RW 10/1/99 800 800 400 Yes <br /> CN 6/1/2000 18630 18630 10000 8630 <br /> Pacific Avenue Overcrossing T <br /> CN 6/1/2000 STP(U) 2000 2000 2000 <br /> Pacific Avenue 0 <br /> McDougall Avenue to Fulton Avenue <br /> Design and Construct Grade-separated Arterial Overcrossing Totals 2000 22240 24240 10400 10630 <br />
The URL can be used to link to this page
Your browser does not support the video tag.