My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4777
>
Resolutions
>
Resolution 4777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 9:50:50 AM
Creation date
3/9/2017 9:50:31 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4777
Date
6/30/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41111\ <br /> Washington State Department of Transportation Page 3 Six Year Transportation Improvement Program <br /> Agency Everett From 2000 to 2005 <br /> County No. 31 Hearing Date 6/23/99 <br /> City No. 0420 Adoption Date 6/23/99 <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. c 5 o Fund Source Information Expenditure Schedule Projects Only <br /> A B. Bridge No. E—„ 4, g o - - - (Local Agency) - . — - <br /> o y 'a C. Project Title 8 o Federal Funding <br /> RNV <br /> v 10 .2 E D. Street/County Road Name or Number c� h 3 D Phase Federal Federal State 4th Required <br /> v ,- E. Beginning MP or road- EndingMP or road E o B Project Start Fund Cost byFund State Local Total Envir. Date <br /> u_ Z 9 9 Phase Funds Funds Funds 1st 2nd 3rd Thru Type (MM/YY) <br /> F. Describe Work to be Done (mmiddryyyy) Code Phase Code 6th <br /> 12-- ---- -- _. - - --- ---- 34 5 6 7 8---- 9--- — 10 1112 13 14 15 16 17 18 19 20 21 <br /> 14 4 2 Phases in Project 04 S 0.25 C PE 4/1/99 <br /> P CN 7/1/2000 71A 155 154 309 236 No <br /> Evergreen Way Improv.(HOV-Emph.Lane Widen.) . T <br /> Evergreen WayO <br /> 112th Street SE to 11500 Block <br /> Design and Construct Roadway Widening to Seven Lanes Totals 155 154 309 236 <br /> 14 5 2 Phases in Project 04 S 0.3 C PE 1/1/99 28 28 I 56 <br /> N/A P CN 8/1/2000 TIA 232 2321 4641 207 No <br /> Evergreen Way Improv.(HOV-Emph.Lane Widen.) T <br /> Evergreen Way O <br /> 11500 Block to Airport Road <br /> Design and Construct Roadway Widening to Seven Lanes I Totals 260 260 520 207 <br /> 14 6 2 Phases in Project 04 S 0.6 C PE 1/1/2000 <br /> P CN 7/1/2001 7001 210, 9101 450' 460 I No <br /> Evergreen Way Improvements 1 T <br /> Evergreen Way O <br /> 47th Street to 41st Street <br /> Design and Construct Roadway Widening to Seven Lanes ' Totals 700 210 910 450 460 <br /> 14 7 3 Phases in Project 04 s 0.1 5/1 <br /> C PE !98 <br /> P RW 1 8/1/98 . ' Yes <br /> 41st Street Improvements • <br /> CN 7/1/99 UATA ' 785 197 982 2001 i <br /> 41st Street I T <br /> O <br /> Rucker Avenue to Friday Avenue <br /> Design and Construct Roadway Widening,Improvements i I Totals --- 785 197 982 200 I <br /> 14 8 1 Phases in Project 31 P ,1 00 PE 1 2/1/2001 500 125 6251 6251 <br /> No <br /> Broadway Corridor Study <br /> Broadway <br /> 41st Street to Beverly Blvd. <br /> Preliminary Urban Design Study and Environmental Review , Totals 500 125 625 625 <br /> 14 9 1 Phases in Project 31P 00 PE 2/1/2001 - 100, 1001 100 <br /> No <br /> Arterial Needs Studies <br /> Various Arterials within City Limits <br /> N/A to N/A <br /> Study Improvement Needs of Various Classes of Arterials Totals 100 100 100 <br /> 14 10 CM-9999(155) 3 Phases in Project 04 S 12.3 C PE 10/1/94EA <br /> P RW 1/1/95 CMAO 500 500 Yes <br /> Airport Road HOV Lanes T CN 3/1/98 TIA 3250 1450 4700 1000 <br /> Airport Road O 1/1/95 <br /> Casino Road to SR 99 <br /> Complete Arterial HOV Lane Project Totals 500 3250 1450 5200 1000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.