Laserfiche WebLink
2) Staff is authorized to proceed into the design development phase of the Everett <br /> Station project generally based upon the site configuration, station building size and <br /> estimated development cost as identified in said schematic design report <br /> Councilperson Introducing Resolution <br /> PASSED and APPROVED this 14th day Apr i1 , of 999 <br /> Col President <br /> 2 <br />