Laserfiche WebLink
. RE?AI� S2rCI?IC,�.IG:IS A:7D LIST OP �Vo"� TO He'. BID <br /> � Paqe!� � � <br /> Address: ���� ���m J/�f� <br /> Install new insulated metal thermalbreak tempered glass <br /> sliding dooc to replace existing oEf kitchen. Finish : <br /> dura-bronze, baked on enamel. Include screen. Replace <br /> lcim iE necessacy to match. Install and caulk as pec <br /> manufacturer 's instrurtions. <br /> Install new overhead ga�age door and hardwace tc replace <br /> exisking. Install new minimum clearance t�ack and <br /> hardware. In cloaed position, all panels of d�or : hang <br /> vertically.• I�oor : paneled and painted two coar.s over <br /> primec, ownec choice of coloc , and : include a <br /> weatheratripping syatem at sill. Installarion : as per <br /> manufacturer's instructions. <br /> Install new insulated metal thermalbreak windows, c+.t'ch <br /> screens, Milgard or equal, with baked on enamel fram�s, I <br /> dura-bronse� on all operable windows, with wood etops i <br /> ' painted two coats over-primer to the exterior for all <br /> windows, ownec choice of color, according to the <br /> Eollowin9 schedules <br /> R441� inrwt�Q - ---TYPC__- - -- - --- <br /> kitchen over sink slider � <br /> I <br /> living room west wall 2-1" overall raw units <br /> north wall 2-1" overall raw uniks <br /> south wall 2 aingle hung, center sash <br /> downstairs bedroom north wall single hung, center sash <br /> east wall sin9le hung, center sash <br /> bathroom north wall remove existing, , no new <br /> window <br /> Eront roov upstaica east wall Zal"�overalla�aw�unita end) <br /> north bedroom upstairs 1 casement <br /> 1-1" overall rar+ unit <br /> south bedroom upstairs 1 casement <br /> 1-1" overall raw unit <br /> s 4�.�3��- �''-- - - - <br /> 3, ' Walls i Cflil�Ras Tear out all wall and ceiling <br /> surfaces in bathroom to studs and joiata. Remove window <br /> and frame in for aheettock. Install R-11 fiberglass i <br /> batt insulation in exte�ior wall. Install 1/2" type 'X' <br /> gypaum wallboard in tub acea (see draw:ngs) . <br /> Install new 1/2" g.w.b. on remaining walls and ceilings <br /> of bath and on new walla except where noted upatairs as <br /> �er drawings. Tape and spackle for smooth wall finish. <br /> Apply drywall sealec to walls . and ceiling in bath and <br /> two coats oil based semi-gloss enamel paint, oaner <br /> choice oE coloc. Paint front room (at top oE stairs) <br /> upatairs, 2 coats flat latex, owner cholce oE colur. <br /> Install cedac board paneling to match exisr_iny as close <br /> as possible in new closet areas in upstairs bedrooms as <br /> shown in drawings. Trim openfngs as per existing. <br />