Laserfiche WebLink
_ = REPAIR SP�FICATIONS AND LZST OP W0�0 BE BID <br /> • Page 4 of 8 <br /> Address• . . 2310 Wetmore <br /> 4. Windows Replace the following windows with raw <br /> insulated units : living room north wall window; kitchen <br /> north wall window (size of new unit to fill opening <br /> above the new kitchen cabinet counter top/fill in <br /> remaining= lower window with framing and materials to <br /> match suirounding wall surfaces) ; and stair middle <br /> landing window to �have tempored glass. Stop in all new <br /> units with wood strips and seal tight the exterior <br /> against the weather elements. <br /> Replace the following windows with opening insulated <br /> aluminum .units : living room east wall both units to <br /> have fixed upper glass and 12" high horizontal `sliders � <br /> across the bottom of each; dining room north wall and <br /> bedroom south wall to have single hun9 units; bathroom <br /> south wall to have 22" x 18" (approximate size) obscure <br /> awning type unit installed at top of existing opening <br /> (fill in lower with wood framing and cover materials to <br /> match) ; and upstai=s windows to have awning type units. <br /> 2 <br /> Cut in new opening over new kitchen sink and install 4 ' <br /> 6" x 3' 6" insulated aluminum window with horizontal <br /> „ slider. Trim out the window to match. Add wood sill. <br /> Closc in .the kitchen west wall window (existing) with <br /> ' fcaming and materials to match surrounding wall <br /> surfaces. See drawings for window locations. <br /> Contractor to repair main floor bedroom sill possibly' <br /> uain9 a removed sill.- - <br /> All work 3n this item to comply with the requirements of <br /> the Uniform Building Code, 1982 edition. <br /> ' s /�Ct7 <br /> 5. -P1 m in Replace all house galvanized water lines <br /> .,wrth type "M" copper lines adding main house shut-off <br /> "and shutt-offs at each fixture. Add a frost-free hose <br /> ' � bibb half •way alonq nocth side of house. <br /> Replumb for kitchen sink, clotqes washer, dryer and hot <br /> rrater tank at their new locations. Install owner's <br /> stainless steel kitchen sink and faucet and relocate , <br /> existing hot water tank undez kitchen stairway. All new <br /> waste and• vent lines to be in plastic. install new <br /> bathtub fnucet, shower ,diverter valve and arm complete <br /> at heat of tub. Note new tub surround to be installed. <br /> Contractor to look at attached drawings for fixture <br /> Zocations. Hook up fixtures. Remove old plumbing lines <br /> left exposed after back porch removal as called out in <br /> item #1 of spec. Contractor to note galvanized waste <br /> line from laundzy tray and kitchen sink angles over to <br /> large waste line to alley at the west end of the lot. <br /> This line needs to be capped off or taken care in <br /> another way. Note also that a drop ceiling will be <br /> installed over kitchen area and in the bathroom per item <br /> #3. All new faucets to be washerless, Delta or equal. <br /> All new plumbing work shall be performed in compliance <br /> _ y � with the Uniform Plumbing Code, 1982 edition. <br /> s �'sa <br />