Laserfiche WebLink
3. Where possible, electric-powered equipment must be used during <br /> construction. <br /> D. EtfffitGY (Post Construction Impacts) (SEPa Energy and Natural <br /> Resources Policies) <br /> 1. The proposed action must conform to all requirements of the <br /> Washington State Enerqy Code. <br /> 2. The Applicant vill actively participate in the Snohomish County <br /> Public Utility District�s "Enerqy Smart Design" proqram for using <br /> cost-effective measures to reduce overall enerqy use. <br /> E. ffiNIRONl�ITAL HSALTH: NOISE (SEPA Environmental Nenith Policies) <br /> 1. All construction activities must be in conformance with the City <br /> of Everett Noise Ordinnnce, EMC Chapter 20.08. This precludes the <br /> operation of loud construction equipment between the hours of ten <br /> p.m. and seven a.m. on weekdays nnd six p.m. and eiqht a.m. on <br /> Saturdays, Sundays end state-recoqnized holidnys. `�' <br /> 2. Where possible, construction noise and vibrntion impacts must be <br /> reduced by the ahieldinq oF noisy equipment and the use of <br /> electric, rather than diesel equipment. Construction equipment ' <br /> must not be laft idlinq when not in use. <br /> F. ffilVIRONl�ITI►L NEALTH: RBL8713E3 TO TH8 ffiiVIROIi![6NT (SEPa. <br /> Environmental Health Policies) <br /> 1. Site remediation must be undertaken to remove soils contaminants <br /> in accordance with the State Department of Ecoloqy Model Toxics <br /> Control Act. If off-site soils are determined to require <br /> remediation due to activities which occurred on this site, it will <br /> be the applicant's responsibility (in the firat instance) to bear <br /> the cost of diaposal end/or remediation. <br /> 2. 1►11 undarqround storaqe tanks (UST's) muat be removed and disposed <br /> of, with the work performed by a licensed tank removal contractor <br /> wrio wi.11 ba directed by a professional licensed as an UST aite <br /> assessor_ by the Stete Department of Ecoloqy. Soils must be tested <br /> at time of tank removal. If contamination 1s nbove Model Toxics <br /> Control �.ct clennup levels, the contaminated soils must be removed <br /> and disposed of in an approved land fill, or the soils must be <br /> remediated. <br /> 3. A complete asbestos containing material (ACM) survey must be <br /> conducted on the buildinq areas prior to demolition. .�17. <br /> identified I►CM must be removed and disposed of in accurdance with <br /> applicable Federnl, state and local requlations. all <br /> 5 <br />