My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2710 WETMORE AVE 2018-01-01 MF Import
>
Address Records
>
WETMORE AVE
>
2710
>
2710 WETMORE AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2019 12:19:38 PM
Creation date
3/9/2017 12:38:40 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2710
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
667
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. Streetscape plan - public/pedestrian amenities, lan ping, <br /> open Space plan <br /> 2. Hinor ![odifications: The Planning Director shall have the <br /> authority to review and approve minor modifications to the <br /> proposal. A minor modification would be a change which: <br /> a, is consistent with all of the conditions in this Document, <br /> b. is consistent with other applicable federal, state and local <br /> requirements, and <br /> c. results in impacts that are within the ranqe of impacts <br /> reviewed in the EIS for the proposal. <br /> J <br /> g, g�(tTH (SEPA Earth Policies and Public Works Standards and <br /> Specifications Manual) <br /> � 1 �Prior to issuance of grading permits, the Applicant must <br /> demonstrate that permits have been obtained for disposal of <br /> excavation materials if the disposal site is within the Everett <br /> City limits. <br /> '" 2�-Prior to issuance of permits, the Applicant's proposed routes to <br /> _ - disposal sites must be reviewed and approved by the Public Works <br /> Department. <br /> 3. The Applicant must comply with all City of Everett qradinq and <br /> drainage requiraments. <br /> � 4✓Measures must be taken to protect exposed soils from erosion <br /> `� durinq wet weather. These measures may includend orrstrawXbales <br /> soils and/or the use of a temporary settlinq po <br /> to retnin eroded so11s on site, as approved by the Everett Public <br /> Works Department. <br /> •5�'Construction operators must rinse the wheels of trucks leavinq the <br /> - construction site whenever possible. <br /> ,��All soil tracked into public streets and alleys must be cleaned up <br /> and removed in e timely manner. A daily monitorinq schedule for <br /> inspection and street clean-up shall be established. The schedule <br /> muat be reviewed and approved by the Public Works Department. <br /> C. �IR (Construction Impacts) (SEPA Air and Other Policies) <br /> 1. Construction personnel must spray exposed soils, truck <br /> undercarriaqes and vheels to minimize dust and trackinq. <br /> 2. Tarps must be used to cover excavated material while in transit. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.