Laserfiche WebLink
. - z - <br /> Preston/Callahan <br /> RE: h1EDICAL DENTAL BU[LDING <br /> These conditions have existed for a very lang time; the lobby problem since <br /> the late 50's. The corridor probleme are probably an accumulation of changee <br /> made over the yeara without the permit process. <br /> Our reco�erciations are these: <br /> 1) both en[ryways be brought up to a minimum two hour enclosure. <br /> 2, each corridor be restored to a minimum one hour integri[y. <br /> In any case, the building as presently constructed, posea a difficult life <br /> safety problem under almost any fire condition and a near impossible problem <br /> uM er the vorst poasible situation. <br /> SP/sh <br />