Laserfiche WebLink
Subject: Proposed Village Thcatre Conccssion, 1621 California St., Everett <br /> May 26, 2011 <br /> Page 2 <br /> equipment or equipment documentation must be submitted. Originally submitted <br /> manufacturcr names and modcl numbers should be rechecked to assure the information <br /> submilted is accurate. I'Icasc note that subsidiarv manufucturers are often not found in the <br /> NSP and equivalcnt listinks The manufacturer name should bc verificd and submit thc parcnt <br /> comnanv namc if onc is found. <br /> 7. Submil a revised iloor plan, drawn to scalc, showing location of all equipment, plumbin� <br /> fixtures and the like that includes the requircd additional information. Thc scale of thc <br /> drawing must be not less than 1/4 inch equals 1 foot. Please note thut plans may be submittcd <br /> in an unsecured PDr format provided that each page of thc floor plan is a separate PDP <br /> Please note that prior to operating pennil issuance and approval to open the new Cacility, after thc <br /> Heallh Dislricl plan review process is compieted and construction is finished, the Health District <br /> permit application process must be completed and n preoperational inspeclion must be <br /> conducted. <br /> Please conlact me if you have any qucstions. My office number is 425339.5250. My email is <br /> rhop�a�shd snohomish.wa.aov <br /> Sincerel�, <br /> C.s'� �f, <br /> / Robert A. Hoppa, .S. / ' <br /> � Gnvironmental He Ith 5pecialist <br /> Pood Gstablishment Plan Review <br /> RI-I/mem <br /> Lnclosure: �rample HACCP <br /> Sneeze Protection Information Sheet <br /> cc: Citv of Everett IIuilding Department <br /> Rob llunt, Village Theatre <br /> Donald I-lallwhich, R.S., Gm�ironmental llealth Specialist <br /> � <br />