Laserfiche WebLink
� ,.� <br /> � A 4I C �I I i ( � . II R C <br /> � Z�DI (,�C'�,uon2 <br /> November 4, 1996 <br /> Mr. Timothy Tyler I "j � � � � " � D <br /> Building Official � � <br /> Ciry of Everetr NOV Q 6 1996 <br /> 3200 Cedar Street __......_........................._ <br /> Everett,WA 98201 CITY OF EVERETT <br /> Public Works Dept. <br /> Re: Wells Fargo Bank - Everett Branch <br /> Plan Check#: 53313 <br /> Job#96089.00 <br /> Dear Mr.Tylcr. <br /> Per my conversation with Jerry Irvin, 1 am writing[o make a special request regarding the Building <br /> Permit for[he Wells Fargo Evere`t Branch Bank currently in Plan Check. <br /> The Project has two components, a Branch T.I. space and the addition of Drive-up lanes in the <br /> existing parking structure. ]erry has informed me that the Drive-up portion requires a Review <br /> Process 2 with public notification which [he building owner is applying foc This process may takc <br /> up to 16 days. <br /> � <br /> ' To expedite the Building Permit for the Branch T.I. portion of the Project,I would like to request <br /> t that the Drive-up lanes be considered a separate permit,allowing the Branch T.I. portion Plan Check <br /> to continue while the Revicw Process 2 application is being reviewed. 1 understand that approval of <br /> the Building Permit for the Branch T.I. does not guarantec Planning Department approval of the <br /> Drive-up lancs. <br /> Please let me know if this request is granted, and if any additional inform.rtion or drawings are <br /> required (or the sepnration of the Pcrmits. Thank you for your assismncc with this. <br /> S�ncerely, <br /> � <br /> Dave Kase <br /> Project Architcct <br /> c: Wclls Fargo: Gary Gcrurd <br /> Callison: R�an Phclps <br /> :olll�xi�rdlh�l�n,lu. <br /> 1170 Ah Ap.,l1100 <br /> Srotl6.WI 1l1042713 <br /> 1706.613.161h <br /> F 106.6!]A61S (�) <br />