My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2802 WETMORE AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
WETMORE AVE
>
2802
>
BASE FILE
>
2802 WETMORE AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 4:01:51 PM
Creation date
3/9/2017 1:08:25 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2802
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br />PORT GARDNER PARTNERS <br />M1 Wdmm Awren, Sub NO, EverA WA QM rAM Jt68gp FecA OM8888g1 <br />DawW L. Berg, DYeetor Of Mwbpw t <br />MEMORANDUM <br />March 9, 1994 File: 0570-1916 <br />To: Mr. Tim Tyler <br />Building Official <br />City of Everett MAC j <br />3200 Cedar Street <br />199q <br />........... . . <br />Everett, WA 98201 Public <br />OF EVERETT <br />Kooks Dept. <br />From: Don Berg <br />Regarding: Port Gardner Building - Development Plans <br />This will confirm and expand upon our telephone conversation of 3/9/94. <br />In the short term, next month or two, we will be performing the following <br />activities. <br />• Removal and disposal of the decorative screens from the exterior. <br />• Removal and disposal of the perimeter gypsum wallboard partitions <br />at all floors. Please note that the partitions have been tested for <br />asbestos and found to be clear of ACM. <br />• Upon expiration of the waiting period, we will proceed with the <br />removal of ACM. T`fese materials consist mainly of pipe insulation <br />and floor tiles. <br />e Removal of certain electrical devices and wiring. <br />Removal and disposal of certain pieces of mechanical and boiler <br />equipment. All of which have been or will be clear of ACM prior to <br />removal. <br />It is my understanding that because of the nature of the imediate work we are <br />not required to procure any building permits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.