Laserfiche WebLink
INTKGRU S <br />A H C H I 1 E 6 r U B E Trinity Lutheran College <br />Port Gardner Building Renovation <br />• Electrical. over the counter <br />• Hazardous Material abatement: PSAPCA <br />• Commercial Hood: separate permit, either Type I or II <br />• Elevator work, if any, through L&I <br />• Sprinklers and Fire Alarm: separate permit <br />8. Other: <br />No requirement to bring the existing building envelope up to current <br />codes. New windows, if any will need to meet current codes. If exterior <br />walls are exposed new insulation may be required. <br />No requirement to bring mechanical or electrical up to current codes. New <br />mechanical and electrical items will be per current codes. <br />The above items represent our understanding of the agreements reached at our meeting. If <br />you disagree with any of these understandings please let me know right away. <br />Sincerely, <br />Jeffrey Middelton <br />Senior Associate <br />Integrus Architecture <br />206-628.3137 <br />email: jmiddelton®integrus.net <br />(S) <br />