My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 WETMORE AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
WETMORE AVE
>
2930
>
BASE FILE
>
2930 WETMORE AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 1:19:53 PM
Creation date
3/9/2017 1:26:51 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2930
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Z <br />EASEMENT AGREEMENT <br />THIS AGREEMENT made this day between the undersigned, herein- <br />after referred to as "Grantors", and the WALL STREET GROUP, a <br />Washington General Partnership, hereinafter referred to as "Grantee", <br />W I T N E S S E T H: <br />IVHEREAS, Grantee owns Lots 18 through 28, inclusive, in Block 6 <br />6S3, replat to the City of Everett according to plat thereof, j <br />records of Snohomish County Auditor, upon which property Grantee is (j <br />presently engaged through its contractor, Baugh Construction, in the <br />erection of an office building; and <br />WHEREAS, Grantors own or occupy business property lying west- <br />erly of Grantee's construction site as hereinabove described and <br />adjacent to the westerly boundary of the right-of-way of the City of <br />Everett presently improved as a public alley way, which alley <br />divides the Grantor's property and other property similarly situated <br />from the Grantee's property, which lies easterly of the city right- <br />of-way or public alley; and <br />WHEREAS, Grantee is required, by the construction plans for <br />their building, to excavate their property and a substantial portion <br />of the adjacent alley, which alley excavation will interrupt ingress <br />and egress over said alley, and Grantee needs to acquire a temporary <br />right to utilize a portion of the easterly portion of Grantor's <br />property as hereinafter described, NOW, THEREFORE, <br />IN CONSIDERATION of the premises and in consideration of the R <br />mutual benefits to be derived, and the covenants and promises of the N <br />Grantee hereinafter set forth, it is agreed between the parties as d <br />follows, to -wit: g <br />1.0 Easement: The undersigned hereby 1, <br />g y grant and convey to the <br />Grantee and the Grantee's contractor, and to the City of Everett for <br />emergency vehicle purposes, for a period of 90 days from the date <br />hereof, an easement for driveway purposes over and across that <br />portion of the Grantor's property described as follows: <br />That area lying westerly of the west bound: y of <br />the city right-of-way for alley purposes ;o the <br />easterly foundation wall of the building now s-..uated <br />upon Grantor's property on the easterly portion of the <br />following described real property located in the <br />County of Snohomish, State of Washington to -wit: <br />1 - EASEMENT AGREEMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.