Laserfiche WebLink
Mr. Ken Callahan <br />Page 2 <br />April 5, 1979 <br />4. Ceiling Plenum (typical floor and ground floor) <br />A. Sprinkler heads to be located at suspended ceiling line. <br />B. All materials located in plenum space to be reviewed and approved <br />by the Fire Marshall as to smoke hazard. PVC materials to be <br />avoided. <br />We are proceeding with the construction drawing phase of our work presently <br />on the basis of the above informationas reviewed in our conference and <br />agreed to in our discussions. Please contact our office if there is any <br />additional information that we should consider in regards to the items in <br />this letter. <br />Very truly yours, <br />WHITELEY, JACOBSEN 6 ASSOCIATES <br />Lance Jonsson <br />LHJ/jf <br />