My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 WETMORE AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
WETMORE AVE
>
2930
>
BASE FILE
>
2930 WETMORE AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 1:19:53 PM
Creation date
3/9/2017 1:26:51 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2930
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRO:MENTAL CHEMIST <br />($25.00 Fee Required) <br />Introduction: The State Environmental Policy Act of 1971, Chapter 43.21C, RCW, requires all <br />state and local governmental agencies to consider environmental values both for their own <br />actions and when licensing private proposals. The Act also requires that an EIS be prc•parei <br />for all major actions significantly affecting the quality of the environment. The purpose <br />of this checklist is to help the agencies involved determine whether or not a proposal is such <br />a major action. <br />Please answer the following questions as completely as you can with the information presently <br />available to you. Idhere explanations of your answers are required, or where you believe an <br />explanation would be helpful tc government decision makers, include your explanation in the <br />space provided, or use additional pages if necessary. You should include references to any <br />reports or studies of which you are aware and which are relevant to the answers you provide. <br />Complete answers to these questions now will help all agencies involved with your proposal <br />to undertake the required environmental review -without unnecessary delay. <br />The following questions apply to your total proposal, not just to the license for which.ycu <br />are currently applying or the proposal for which approval is sought. Your answers should <br />include the lmuc'ts which will be caused by your proposal when it is -.ompleted, even though <br />completion may not occur until sometime in the future. This will allow all of the agencies <br />which will be involved to complete their environmental review now, without duplicating <br />paper work in the future. <br />NOTE: This is a standard form being used by all state and local agencies in the State of <br />Washington for various types of proposals. Many of the questions may not apply to your proposal. <br />If a question does not apply, just answer it "no" and continue on to the next question. <br />ENVIRONMENTAL CHECKLIST FORM <br />1. BACKGROUND <br />1. Name of Proponer' Galt Enterprises <br />2. Address and Phone Number of Proponent: 3201 Fairview East <br />Seattle, Washington 98102 <br />3. Date Checklist Submitted 23 January 1979 <br />4. Agency Requiring Checklist City of Everett Building Department <br />S. Name of Proposal, if applicable:_ Wall Street Building <br />6. Nature and Brief Description of the Proposal (including but not limited to its size, <br />general design elements, and other factors that will give.an accurate understanding; <br />of its scope and nature): Ten story office structure (105,400 gross square feet), two <br />levels of parkine below grade (13,200 gross square feet each). Total eross area \%:li <br />be 131,800 square feet, i <br />7. Location of Proposal (describe the physical setting of the proposal, as well as the <br />extent of the land area affected by any environmental impacts, including any other <br />Information needed to give an accurate understanding of the environmental setting of <br />the proposal): NW corner of intersection of 11 etmore Avenue and Wall Street. ' <br />j <br />Site is presently used for parking and a gasoline service station. The site slopes <br />slopes slightly (six feet on Wetmore and two feet alone Wall). < <br />S. Estimated Date for Completion of the Proposed Action: start construction <br />April 1979 - estimated completion June 1980 j <br />T <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.