Laserfiche WebLink
INSPECTION REPORT <br />�, <br />a4—/ 7— cry <br />Address <br />Contractor — <br />Owner OJ <br />Date — -�-3�) <br />dApp-ROVAL PARTIAL APPROVAL <br />VIO aTae CORRECTION REOI ,ESTED <br />Corrections listed below MUST BE MADE betore work can be approved. <br />j Please contact inspector and arrange lot appointment. <br />Was not able to perform inspection. <br />CALL 259-B810 FOR REINSPECTION - 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />it <br />TYPE OF INSPECTION REQUESTED r <br />❑ Temp. Elect. <br />1-1Framingg <br />�J Drywall, Nailing <br />j Gas Piping <br />J Consultation <br />❑ Footing <br />❑ Foundation <br />J Shear Nailing <br />J Groundwork <br />J Strum Slab <br />❑ Ductwork <br />❑ Wood Stove <br />J Grid <br />g-in <br />_ �hFinal �Tlnsulabon <br />Se <br />❑ Masonry <br />❑ Other <br />❑ MECH: Pml. No <br />ELEC: Pml. No. zuu—�J PLBG: Pml. No. <br />