Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System page 1 <br />10/12/191,: _ <br />Date Ra_ign :01/09/1989 - 10/09/1995 <br />CM Work Order Range :1001091070001 - UT2608- - Pattern 7101196750414 <br />Pattern <br />: <br />Item Range :<Blank> - WW22020001 <br />Program ALL Function ALL Activity ALL <br />CMWORK <br />ORDER ID: 7101196750414G OF THIS Title: CONVERT 3417 WETMORE AVC <br />< <br />Item ID: WS3095JO45 -- WATER SERVICE <br />Location ID: -- Activity 675 <br />Program 710 Function 119 <br />Date Completed: 10/05/1995 <br />overall Craft: Assigned to: <br />Issued: 10/02/1995 issued by: WMW <br />out of Service? NO Priority: <br />Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />planned Hrs Actual Hrs <br />Cost <br />Craft ID <br />Name ---- ----------- <br />-------------------------- <br />---------- <br />---------- <br />4.00 <br />60.12 <br />----- ------ <br />UL SSJ <br />SMITH, STEVE J. <br />0.00 <br />0.00 <br />4.00 <br />32.00 <br />DL WCA <br />WHETSTINE, CHRISTOPHER A. <br />---------- <br />Total Labor <br />Cost: <br />92.12 <br />Materials: <br />Date # Used <br />Cost <br />ID <br />Description <br />----- -- -------- <br />---------- <br />___ <br />ADAP34000547 <br />------------- <br />ADAPTER 3/4" MIP X INSTA-TLID@ <br />10/05/1995 <br />10/05/1995 <br />1 <br />15.46 <br />13.01 <br />BOX000056247 <br />BOX METER. PLA 15" X loll W/ <br />COMPRESSION @ <br />05/1995 <br />1 <br />7.20 <br />3.50 <br />COUP34003347 <br />COUPLING 3/4" <br />ELL 3/4" STREET BRASS <br />10%05/1995 <br />2 <br />1 <br />30.98 <br />ELL034104247 <br />METE36089447 <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />10/05/1995 <br />10/05/1995 <br />1 <br />1.70 <br />NIPP34131947 <br />„ <br />NIPPLE 3/4 X 4„ BRASS <br />10/05/1995 <br />1 <br />0.26 <br />PIPE34060647 <br />PIPE 3/4" POLY I.P.S. <br />3/4" LOCK WING IP@ <br />10/05/1995 <br />2 <br />16.98 <br />---------- <br />VALV34008348 <br />VALVE METER <br />Total Material <br />Cost: <br />89.09 <br />vehicles: <br />Description <br />Hours Cost <br />---------- <br />ID <br />---------------- <br />91 CHEV 1-TON HYD UNIT <br />_ -- <br />00 <br />---------- <br />22.40 <br />V2117 <br />Total Vehicle <br />Cost: <br />22.40 <br />Work Description: --------------- <br />------------------------ <br />------------------- <br />METER# 40635838 <br />