Laserfiche WebLink
Bob Wilkie <br />Plan Check #S 1447 <br />May 22, 1996 <br />Page 2 of 2 <br />Upon resubmittal of the drawings, your application will be given prioriry and plan review will commence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure that the <br />proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />9���.� <br />JeffHeilman <br />Development Technician <br />ni:��um.y�.a�tz) <br />