Laserfiche WebLink
S'IORMWAT[iL SIT[ PLAN <br />\tADISON COMMUNI'TY CHURCH <br />MAY 26, 2006 <br />PAGE 6 <br />IV: ANALYSIS AND DESIGN OF EROSION AND SEDIMENT <br />CONTROL BMP'S <br />TEMPORARY COVER BlV1P'S. <br />BMP E1.10, Temporary Secding of Strippcd Arcas: <br />Tcmporary sceding of topsuil stockpilcs and odicr stripped arcas will be necessary during <br />construction. The proposcd sced mix is given on the construction plans and confonns to <br />the City of Evcrctt Standard. <br />BMP E1.15, Mulchingand Mattieg: <br />The exposed surfaces will be hyJrosecded with an crosion control mixture. This will <br />indude a wood fiber mulch. Ou steep slopcs a tackifier ar liquid soil bunding agcnt may <br />bc added. <br />BMP E1.2Q Clcar Plastic Co��cring: <br />This involvcs covcring a barc arca with dcar plastic which protccts thc immcdiate arca to <br />the detriment of downstrcam arcas. This BMP will only bc used on this site if rcquired for <br />immediate sitc protcction. <br />BMP E 1.25, Prescrving NaWral Vcgctation: <br />Given the urban nature of the sitc, this BMP wil I ha��c litdc impact on the site. <br />BMP E1.35, Pennanent Secding and Planting: <br />Thc sitc will be scedcd aftcr each segmcnt of grading has bccn complctcd. A final <br />landscaping plan will bc prepared r"or the site and will be implemcnted afler the final <br />conshvction. <br />E3MP G1.4s, Topsoiling: <br />Thc nativc top soil will be strippcd and stockpilcd. Wastc arcas will bc found for ihc sod <br />or it will be removcd from the site. Remaining topsoil will be used to cover the subgrade <br />ofvcgetatcd arcas. <br />STRUCTURAL EROSION CONTROL BD1P5 <br />BMP E2.10, Stabiliud Constr�ction Entrancc: <br />There will be a stabilizcd construction entrance located along \Vetmore Avenue at the <br />futurc access point. <br />l3MP E2.15, Constniction Ro�d Stabilization: <br />l�hc parking arcas will bc slabilizcd aftcr cunstructiun of tl�c subbradc is complctc by <br />placing thc basc coarsc matcrial. <br />BMP [2?0, Dust Control: <br />Dust cuntrol will bc rcquircd an thc sitc during grading operations. This will most likcly <br />bc through thc usc uf �vatcr tc Jumpcn thc surtacc soil. <br />J Oe.eriyParAcammunryC�urcn-S�ROs�0388m�age65PMaaison00CDWHlSfm <br />