My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6900 WETMORE AVE MADISON COMMUNITY CHURCH 2018-01-01 MF Import
>
Address Records
>
WETMORE AVE
>
6900
>
MADISON COMMUNITY CHURCH
>
6900 WETMORE AVE MADISON COMMUNITY CHURCH 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2019 8:31:05 AM
Creation date
3/9/2017 2:59:02 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
6900
Tenant Name
MADISON COMMUNITY CHURCH
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sl'ORMWATER SITE 1'LAN <br />MADISON COMMUNITY CHUKCf{ <br />MAY 26, 2006 <br />PAGE 7 <br />BMP E2.3Q SubsurPacc Drains: <br />Subsurface drains beyond thc standard footing drains for structures will not be used on <br />this site except as designed for structural retaining walls. <br />BMP E2.35, Surfacc Roughening: <br />All slopes greater than 3:1 require surface roughening. This may be accomplished by <br />`track walking' or Jriving a crawler tractor up and down thc slope, Ieaving a pattem of <br />cleat imprints parallr.l to slope contours. <br />BMP E2.4Q Gradicnt Terraces: <br />This BMP will not be used on this sitc. Runot�f will be interccptcd priorto flowing down <br />stecp slopes and other BMP's such as slope roughening will be used to protect die slope <br />from direct precipitatian. <br />SEDIMENT RETENTION BMP'S <br />BMP E3.10, Filtcr Fabric: <br />Filter fabric fencing will be uscd downstrcam of all construction where flow could leave <br />thc site. <br />BMl' E3.30, Stonn Drain Inlet Protection: <br />This BMP will be uscd to protect cxisting catchbasin inlets that are subject to storm flow <br />from portions of the construction site. As the storm system is installed, the new catch <br />basins will also be protected. A detail for catchbasin inscrts is included on the plans. <br />BMP E3.40, Temporary Sediment Pond: <br />The detention pond will be configured to scrve as a sediment pond during construction. <br />Sizing calculatians arc included on the construction drawings prepared for the site. <br />J'Oc.eriy vaM Commu--ry Cnnrcn � S�R 0<-0:8`D�a�naqe�55P Maa�son OOCDWHISrtfI <br />
The URL can be used to link to this page
Your browser does not support the video tag.