Laserfiche WebLink
S'I'ORD1R'A"1'GR SIll3 PLeW <br />�L\llISON C0�1�tUNIII' CHURCH <br />MAY 26, 2006 <br />PAGE 14 <br />VI. ANALYSIS AND DESIGN OF SOURCE CONTROL BMP'S <br />BMP'S FOR CONSTRUCTION SITES <br />BMP C1.20 Pctroleum Product Handling. <br />Thc usc of petralcum products on thc sitc shall bc donc in accordancc with B�viP C1.20 to <br />prc��ent thc Jischarge of the pctrolcum to the soils of the site. A staging arca f'or equipment repair <br />and maintenance will bc cs�ablishcd away from all drainage courses. Safe storage areas shall be <br />Jcsignatcd. <br />BMP C1.30 Nutricnt Application and Control. <br />Thc application of fcrtilirers shall be staged in such a manner as to minimize the transport of <br />inorganic nutricnts to watcnvays and thc ground watcr. <br />DMP C1.40 Solid Wastc Handling and Disposal. <br />A solid wastc disposal plan shall be implemcated for the conswction site. The plan shall address <br />the disposal of general construction waste. All waste shall be disposed at an approved landfill or <br />rccycled by an authorized recycler. <br />BMP C I.50 Use of Chcmicals/Hazanious ProJucts �uring ConsWction. <br />Chcmicals uscd during construction should bc properly applicd and disposcd in a manner <br />approvcd by local authoritics. Information is availablc from thc loc�l hcalth dc�artmcnt or thc <br />liazardous Substancc hifonnalion Hotline (1-800-633-7585). <br />[3MP C1.G0 Equipmcnt �Vashing. <br />Thinncrs or solvents should not be discharged to the surface or ground watcc Altemate dcaning <br />mcthods and approvcd disposal of chcmicals should bc uscd. <br />I3MP Cl JO Spill Control Planning and Clca�up. <br />Construction sitc supcn�isors shall adopt an appropriatc spill control plan for any hazardous <br />substanccs uscd on the site. The plan shall identify an individual responsible for implementing <br />the plan should a spill occuc A copy of the plan shall be kept at the job site and be available to <br />all personncl. <br />E3MP C1.30 Trcatmcnt and Disposal ofContaminatcJ Soils. <br />If contaminated soils arc cncountcrcd during caRh�vork activitics or by dic spill or Icak of a <br />hazardous product, appropriatc mcasures shall be uscd to Jetemiinc thc proper methods of <br />dcaling with thc soil. Thc Modcl Toxics Control Act, Ch. 70.105 RCW, requires that Lcology's <br />Toxic Clcanup Program bc notiticd if contaminatcd soil or growid watcr is cncountcrcd during a <br />projcct. <br />l3MP C I 90 Concretc Trucks/Spray �Vashing of Exposcd Aggregate Driveways and Walkways. <br />�Vash watcr ladcn with portlnnd cancnt shall not bc allowcd to cntcr a drainagc course. All <br />concrcte �vash watcr will be collectcd, allowcd to dry, and cithcr backtilled or removed and <br />disposcd of at an appro� cd sitc. <br />� nc.��yr,nco�•�-��,.i�en,��m�saoae:s�o����,;��ssnn„o�.,o�ooeDWHlsrm <br />