Laserfiche WebLink
` STORMWATER SITL• PLAN MAY 26, 2006 <br />1 <br />MADISON COMMUNITI' CHURCH PAGE 15 <br />1 E3h1P C2.00 Usc of Sandblasting Grits. <br />� Thcre will bc no sand blasting on this construction sitc. <br />BMP C2.10 Disposal of Asbestos and PCBs. <br />� The demolition of the existing buildings �vill follow existing rcyuirements fa the inspection and <br />control of asbestos and PCBs. <br />� Additionally, stortnwatcr catchbasins (or gratcd inlets in other structures) on the site will be <br />spray painted "Dump no waste, drains to strcam" with a stensile. This spray paint will bc <br />rcncwcd annually. A notc is placcd on thc storni drainagc drawings. <br />� <br />I���ue��n� ra�w co+.m��,ry a.��rn � siN oa-0:e�o�a��a�e�ssr ura:sw, ooeOWHlsrm <br />