Laserfiche WebLink
Plan Check � 41182 <br />July 19, 1993 <br />Page Two of Two <br />,�, <br />6. Provide attic vendlation type, size, and location. Show the require� net area <br />calculations assuming approzimately 75`% of the vent azea is given from the <br />manufacturer. The required ventilation area rado is 1/I50 of attic area or <br />1/300 of attic area if at least half of the vent area is more than 3" above eave <br />vents (providing the remaining portion of the vent area}. Openings to have <br />1/4" corrosion, resistant metal mesh covering, vented blocldng shall not <br />compromise the structural integrity of shear transfer, roof diaphr3gm to shear <br />wall. <br />Li order for the processing of your application to condnue, it will be necessazy to <br />provide the Building Aepartment with two complete new sets of drawings reflec6ng the <br />corrections requested. <br />Upon re-submittal of the drawings, your application will be given priority and plan <br />review recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to <br />ensure that the proposed structure will be constructed in compliance with all adopted <br />codes. <br />Sincerely, <br />Jeff Heilman <br />Development Technician <br />M/pkk7-19 <br />