\ <br /> . \ �,. <br /> 8. Where utility wnne�.'tiona are requ'ved through adjacent propa'tia wements must b��°cate�� <br /> such a manner as to minimiu d►e visual impact on the adjoining propaties to the gratest exca►t ,� <br /> feasible and must be revegetated in accordance with a landscaping plan approved by the Pltnnie6 ' <br /> Department. Landscaping must be consistent with Engineering and PubGc Services ra�uiremrnu <br /> for protection and maintenance of the utility easement and facilities and shouid consist of native <br /> sluubs and groundcovu. (SEPA I.and and Shoreline Use,Plant and Animal, and Public Services <br /> and Utilities Policies) <br /> 9. Water mains must be constructed prior to the final approval of each Binding Site Plan map far each <br /> phase o€the development. The water mains for Phase I must be��stalled Prior to recording the <br /> Bmding Site Plan map for Lot 1, 2 and 3. '3'he City of Everett will make deci�ions on the�peeifie <br /> location aad daign standarda tor other water main�w�ithin t6e CSR property at t6e time <br /> additional lob arc crexted or development is �roposed. <br /> 10. On-site watecmain will be staked within an easement to the City. The easement will be submitted to <br /> the City prior to issuance of permits. <br /> 11. As-builts of water systems must be submitted per City Design and Construction Standards and <br /> SpeciRcations for Development. <br /> There is a fourteen(14) day, public comment period on the proposed public road, and the demand for <br /> 4,000 gallons per ininute of fire flow. <br /> Responsible . <br /> pm¢ia►; Paul A. Roberts <br /> Title: Planning and Community Development Director <br /> Address: 2930 Wetmore Avenue, Suite 8-A, Everett, WA 98201 <br /> Dste: <br /> INFORMATION FOR TAE DEVELOPER <br /> 1. A Public Works Permit is required for this project. De:ailed drawings in accordance with City <br /> Design and Construction Standards shall be submitted to the Public Werks Deparcment, showing <br /> landscaping, utilities, storm drainage, temporary const�uction e:osion control, and all requirod <br /> improvements in the public right-of-way. Public Works Department approval of these drawings is <br /> required prior to any permits beinF;ssued. All improvements shall be completed, approved, and <br /> warranted before the final approval is granted. <br /> 2, The construction plans must be designed from a site sucvey perfortned by a licensed State of <br /> Washington land surveyor. <br /> 3. My grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 4. City Strcets are to be kept clear of dirt and debris at all timed during construction. Dust <br /> suppression und street cleaning must occur as directed by the Public Works Inspector. <br /> 6 � <br />