Laserfiche WebLink
i � <br /> � 5. Analysis and Design of Required Runoff Control (Treatment and <br /> Stream Bank Erosion Control) BMPs (Hydraulic Report) <br /> I Ezisting Conditions <br /> ( The original topography of the site was sloping at about 3 percent from south to north, so the <br /> runoff from stormwater flowed into Glenwood Crcek. The existing tupography of the site is <br /> ( changing daily because the carrent use is a gravel pit. Portions of the site aze being mined while <br /> I other portions aze being reclaimed. The existing slopes vary from about 1 percent to vertical <br /> walls. Stormwater runoff from the existing gravel pit either infiltrates into the ground or flows <br /> { into an onsite pond. There aze no off-site tributary azeas contributing runoff to this project basin. <br /> I '['he soil as classified by the Soil Survey of Snohomish County Area by the Soil Conservation <br /> I 5ervice datecf luly 1983 is Alderwood gravelly sandy loam, Alderwood Urban L.and Complex, and <br /> Toku1 gravelly Io�m. This soil is classified as a Hydrologic Soil Group C. <br /> � To be consetvative in the detention pond calculations,the existing conditions for all azeas within <br /> the project were assumed to be undisturbed old growth forest with a Curve Number(Cf�of 76. <br /> The existing conditions time of concentration is 2.23 hours. The CSR Associated Aerial <br /> I Topographic Survey by the Nies Mapping Group, lnc.,dated November 1998, was used to <br /> determ'vie the flow rate through the FSA project site. See Figure 1. <br /> IDeveloped Conditions <br /> Ipgp will be improving the 37.4 acre subbasin of the former gravel pit into a product disvibution <br /> warehouse as previously mentioned. Stormwater runoff will be d'vected into a storm sewer <br /> � system which will convey the water to a detention pond with two open water cells and a wedand <br /> I treatment cell with an oudet control structure. 'i'he control structare, a type 2 catch basin, with <br /> thtee orifices will discharge the controlled runoff into an on-site 36-inch diameter storm sewer <br /> which will flow uito a proposed 36-inch diameter storm drain system in a proposed road. For the <br /> description of Ihe flow beyond this point, see the one quarter mile downstream inventory section <br /> in this report. <br /> ITo be conservative in the detention pond calculations for the developed conditi�ns, we assumed <br /> that 90 percent of the total area is to be impervious. The calculations for stormwater detention <br /> { i�iclude the build out for Phases 2 and 3. We used a Curve Number(CM of 98 for the impetvious <br /> � area and 86 for the pervious azea. The developed conditions time of concenvation is 0.20 hours <br /> ` for the impervious azea and 0.11 hours for the pervious azea. The developed conditions for <br /> , Phase 1 are shown on Figure 4. <br /> , See the attached reduced copies oE the Storm Drainage Plan,Detention Pond Sections and <br /> � Details, and Storm Drainage Details and Notes, Figums 4, 5, and 6,respectively. <br /> I � ,�� <br /> Fwd Scrvices uf America S�ormw��cr Site Plan a�d Starmwater Ddention Pond <br /> I Hydraulic Repc�: 4 ( p) <br /> v <br />