My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 SHUKSAN WAY 2016-01-01 MF Import
>
Address Records
>
SHUKSAN WAY
>
1001
>
1001 SHUKSAN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 7:37:09 PM
Creation date
3/9/2017 7:34:52 PM
Metadata
Fields
Template:
Address Document
Street Name
SHUKSAN WAY
Street Number
1001
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
565
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . <br /> I Detention Pond Design Criteria <br /> � Water Qualitv/Water Quantitv Svstems <br /> The following stormwater detention design criteria will apply to this project: <br /> I <br /> � • Release rate of half of the 2-yeaz pre-existing 24-hour dasiga storm with detention for the <br /> balance of a 2-year developed 24hour design storm <br /> � . Release rate of a ]0-yeaz pre-existing 24hour design sterm with detention for the balance of a <br /> I 10-year developed 24-hour design storm <br /> . Release rate of a 100-year pre-existing 24-hour design s�orm with detention for the ba'ance of <br /> � a 100-yeaz developed 24-hour design storm <br /> The proposed project site will be 90 percent impervious(pavement, ioof, sidewalk,etc.); <br /> I therefore, a volume correction factor of 0.46 is applied to the detention pond according to the <br /> City of Everett Stormwater Management Manual. <br /> I Design Summary <br /> ( Preciaitation Data <br /> I <br /> The following is a table of rainfall depths for the 6-month, 2-year, 10-year, and 100-year, 24-hour <br /> Istormc from the City of Everett Stormwater Management Manual: <br /> Desi¢n Storm Rainfall Denth (inches) <br /> I6-month, 24-hour 0.99 <br /> 2-year, 24-hour 1.55 <br /> I 10-year, 24-hour 2.25 <br /> 100-yeaz, 24-hour 3.25 <br /> i <br /> � Computations for Stormwater Detention <br /> IThe Santa Barbara Urban Hydrograph (SBUH) method with type lA stomu was used with the <br /> WaterWorks HMS computer program to calculate the peai:flows and volumes of tt�e various <br /> I storrtu, the detention pond outlet orifice sizes in the control structure, and the requved detention <br /> pond volumes. The new convol discharge orifice structure was sized to pass the pre-developed <br /> conditions discharge rates of one-half the 2-year, 24-how stottn, as well as the 10-year and 100- <br /> i <br /> year, 24-hour storm events. <br /> IFood Suviccs o(Amcrica Stamwatcr Sitc Plan and S�amwata Detentim Pand ��^°� <br /> t Hydraulic Rcport _5' �u�� (�t <br /> I tJ <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.