Laserfiche WebLink
i <br /> SecNoo 6: ENERGY AND NATURAL RESOURC'ES <br /> 6.1 ELE.^.TRIC ENERGY <br /> 6.1.1 Threshold <br /> The PUD No. 1 forecasts an adequate supply of elxtricity for the SW Everett Sabarea. Special <br /> Property Use permits are required for abovegromz3 utiiity facilities. These revievis will address <br /> landscaping and screenin�, view and compatibiliry issues. <br /> � <br /> 6.1.3 Mitigation Measures <br /> I. All power lines carrying a voltage of less than 15 kV must be undergrounded. (SEPA Land <br /> and Shoreline Use Policies) <br /> 6.3 NON-RENEWABLE RESOURCES <br /> 6.3.1 Threshold <br /> i <br /> New mining activities are not addressed in this SEPA review. Ii <br /> i <br /> 6.3.3 Mitigatioo A'�easures { <br /> � <br /> 1. Mining sites must comply with the Department of Natural Resources reclamation � <br /> requirements. On sites with existing mined slopes which are not subject to DNR regulations, <br /> slopes must be remediated to 1.5 horizontal : 1 vertical (1.SH:1V), except for glacial till <br /> slopes which can be remediated to 1H:1 V slope if approved by a quali5ed geotechnica! <br /> engineer. All remediated slopes must be covered with top soii material that will support <br /> vegetation,jute matting or equivalent; and be revegetated with hydroseed,groundcover and j <br /> shrubs. (SEPA Earth and Water Policies) I <br /> Section 7: ENVIRONMENTAL HEALTH <br /> 7.1 NOISE <br /> 7.1.1 Threshold <br /> All development in Everett must be in conformance with the requirements of EMC 20.08, the <br /> Noise Control Ordinance. Noise studies may be required to detetmine if a proposal is in <br /> conformance�vith the ordinance. <br /> % <br /> zt1 <br />