My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1202 SHUKSAN WAY 2018-01-01 MF Import
>
Address Records
>
SHUKSAN WAY
>
1202
>
1202 SHUKSAN WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2019 3:42:29 PM
Creation date
3/9/2017 7:53:05 PM
Metadata
Fields
Template:
Address Document
Street Name
SHUKSAN WAY
Street Number
1202
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> .. i <br /> 7.1.3 Mitigation Measures ! <br /> i <br /> 1. Waming devices on vehicles (back up beepe�s)are exempt from the City's noise ordinance, <br /> but are perceived as irritating by most people. Develogments that abut residential zones must <br /> be designed to shield vehicle maneuvering and loading areas from residential areas by <br /> place:nent of buildings,berms, etc. (SEPA Environtnental Health Policirs) <br /> 7.2 TOXIC/HAZARDOUS MATERIALS AND EXPLOSIVES <br /> 7.2.1 Threshold <br /> Add�tional SEPA analysis is required for clean-up of contaminated sites. <br /> 7.2.3 Mitigatio� Measures <br /> Construction Phase <br /> 1. Construction equipment and vehicles must be maintained so they do not leak fuels c.r <br /> lubricants. During constn:ction, a staging area must be specified for all vehicle maintenance <br /> activities. The staging area must be located well away from all drainage courses. Where <br /> possible, all stormwater from related maintenance areas must be directed to the sanitary <br /> sewer, rather than the stortnwater system. (SEPA Earth, Water and Environmental Health <br /> Policies) <br /> 2. During construction activities, all spills of fuel and hazardous materials must be contained <br /> and removed in such a manner as to prevent their entering the waters and soils of the State. <br /> Cleanup of spills must take precedence over other work on site. (SEPA Earth, Water and <br /> Environmental Health Policies) <br /> 3. During construction, all petroleum products,chemicals, and building materials that could <br /> contaminate tunoff must be stored in a lined covered azea. An impervious berm must be <br /> constructed around the perimeter of the storage area. The storage area must be located away <br /> from environmentally sensitive areas. (SEPA Earth, Water and Environmental Health <br /> Policies) <br /> Oaeration Phase <br /> 4. Dumpsters must be covered and maintaincd, so that stortnwater runoff from refuse does not <br /> enter storm drains or infiltrate into soil. (SEPA Earth, Water and Environmental Health <br /> Policies) <br /> % <br /> ¢o <br />
The URL can be used to link to this page
Your browser does not support the video tag.