My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1202 SHUKSAN WAY 2018-01-01 MF Import
>
Address Records
>
SHUKSAN WAY
>
1202
>
1202 SHUKSAN WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2019 3:42:29 PM
Creation date
3/9/2017 7:53:05 PM
Metadata
Fields
Template:
Address Document
Street Name
SHUKSAN WAY
Street Number
1202
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 8-2 <br /> Sewer System Capital Improvements Needed for the Portioo of the <br /> SW Everet Subarea Served by the CIty of Everett <br /> Ca�ital Improvement Cost Respona- Properttes That May EaNmsted <br /> N�� Ibllity[or Be Required to Fuod ail Timiog of <br /> Funding or a Portion of the Improvo- <br /> Improvement ment <br /> 2,950 feet on $735,000 City a��d Merrill Creek Associates, Before <br /> Hardeson Road Developer Associated Sand and 2020 <br /> between Overall Gravel, Overall Laundry <br /> Laundry and Merrill <br /> Creek Pkwy. <br /> 2,100 feet of Merrill $525,000 City and Merrill Creek Associates, Before <br /> Creek Pazkway Developer Associated Sand and 2020 <br /> benveen Hardeson Gravel, and Ovetall <br /> Road and Glenwood Laundry <br /> OTHER REQUIREMENTS <br /> 1. A Public Works Permit is required for this project. Detailed drawings in accordance with <br /> City Design and Construction Standards shall be submitted to the Public Works Depaztment, <br /> showing site-pazking layout, landscaping, landscaping, utilities, stortn drainage, temporary <br /> construction erosion control, and all required improvements in the public right-of-way. <br /> Public Works Department approval of these drawings is required prior to any pennits being <br /> issued. All improvements shall be completed, approved and wamsnted Uefore the Occupancy <br /> Permit is issued. <br /> 2. Note: the Everett Public Works Department has determined that the site can be served with <br /> 4,000 gpm fire 8ow. <br /> 3. Parking must be per Ciry Zoning Code and City Design and Conshvction Standards for <br /> Development. <br /> 4. My grading/f;ll on this site shall be done so as to not impact the surrounding properties. <br /> 5. This project must comply with the current City of Everett Building Code and Sprinkler <br /> Ordinance. <br /> 1� <br /> Za <br />
The URL can be used to link to this page
Your browser does not support the video tag.