Laserfiche WebLink
. . c - <br /> , Lu. S. Mayes ( <br /> June 14, 2001 i <br /> Page 2 <br /> . i <br /> i <br /> 4. Detail 9/S2.2 indicates no wrapping for the chord steel. The plans should indicatc where <br /> wrapping is required and how the bars should be wrapped. <br /> 5. The clip and welding requirements of 9/S2.2 are unclear. Also, will this welding not burn <br /> the wood naiier? <br /> 6. Detail 8/S2.2 appears to be an alternate to Detail6/S2.2. It is unclear on the roof framing <br /> plan exactly where detail 8 should be applied. <br /> Please prepare a response letter showing where each item in this conection letter is addressed on <br /> the plan set. <br /> Upon resubmittal of the drawings, your application will be given prioriry and pIan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient iuformation [o ensure that <br /> the proposed structure will he constructed in compliance with all adopted cudes. <br /> Sincerely, . <br /> � V�, r�,� <br /> %� � i. <br /> � ir <br /> Steve Miller ' <br /> Associate Engineer <br /> sancoroi..cr;i.iwioin rr.:io,waaw /L. <br />