Laserfiche WebLink
� . , <br /> �,' ` +..i `1� � <br /> , <br /> � <br /> ' - � ,^ ., .. . <br /> 1 � �= <br /> FINDINGS AND DECISION , � ? L :` ;'�/i' ~� <br /> L;;. _ �:, i:� � <br /> OF THE HEARING EXAMINER OF THE APR 1 ;? � „ 1 � I <br /> CITY OF EVERETT .................... " '°�3 -.....� <br /> CITy OF�f��............. � <br /> CITY OF EVERETT OR A PRO AL'OF AF THE PuGli� wo�ks�R�� <br /> SPECIAL PROPERTY USE PERMIT <br /> "FIRE STATION" SPU 3-92 <br /> DECISION: The Special Property Use Permit is granted subject to <br /> conditions listed. <br /> INTRODUCTION <br /> The City of Everett Fire Department, 3200 Cedar Street, Everett, Washington 98201 <br /> (hereinafter referred to as Appiicant) requested approval of a Special Property Use Pertnit <br /> for the construction of a fire station at 14th Avenue and 112th Street S.E., Everett, <br /> Washington (subject property). The fire station will consist of a 3,000 square foot buiiding <br /> with two apparatus bays. It will also have seven parking spaces. In addition, the proposed <br /> project will include installation of a 500 gallon above ground fuel tenk. <br /> A hearing r,n ihe request was held before the Hearing Examiner of the City of Everett on <br /> April 1, 1693. At the hearing the following presented and evidence: <br /> Don Wood, Planning Departmsnt <br /> John (�oble, Facilities& Maintenance <br /> Terry 011is, Fire Chief <br /> Arlene McKinney <br /> 11305 W. Ibberson Drive <br /> Everett, WA 98208 <br /> At the hearing the following exhibits were submitted and � •4re admitted as part of the <br /> official record of th�se proceedings: <br /> 1. Staff Report <br /> 2. Location Map <br /> 3. Narrative Statement <br /> 4. Site Plan <br /> 5. Landscaping Plan <br /> 6. Elevations <br /> 7. SEPA Comments <br /> 8. SEPA MDNS#65-92 <br /> 9. Above Ground Fuel Storage Tank Drawing <br /> 10. Letter to Planning DepaKment dated 3-24-93 from Mr. 8 Mrs. Bowen <br />