Laserfiche WebLink
NlA. <br /> g. About what percent of the site will be covered vvith impervious surfaces <br /> after project construction (for example, asphalt or buildin!1s)? <br /> N/A. <br /> h. Proposed measures to reduce or control erosion, or other impacts to the <br /> earth, if any: <br /> N/A. <br /> 2. Air <br /> a. What typas of emissions to the air would result from the proposal (i.e., <br /> dust, automobile, aiors, industriai wood smoke)dur'ng construdion <br /> and when the project is completed? If any, generally describe and give <br /> approximate quantities if known. <br /> N/A. <br /> b. ArE there any off-site sources of emissions or odor that may affect your <br /> proposal? If so, generally describe. <br /> NlA. <br /> c. Proposed measures to reduce or control emissions or other impacts to <br /> air, i(any: <br /> NIA. <br /> 3. Water <br /> a. Surface <br /> 1) Is there any sur(ace water body on or in the immediate vicinity of the site <br /> (including year-round and seasonal streams, saltwater, lakes, ponds, <br /> wetlands)? If yes, describe type and nrovide names. If appropriate, state <br /> what stream or river it flows into. <br /> NO. <br /> 2) Will the project require any work over, in, or adjacent to (within 200 feet) <br /> the described waters? If yes, please describe and attach available plans. <br /> NO. <br /> 3) Estimate the amount of fill and dredge material that would be placed in <br /> or removed from surface water or wetlands and indicate the area of the site <br /> that would be affected. Indicate the source of fiil material. <br /> FORM\f 1-053 82-001-0 092801 KLL PAGE 4 OF 13 <br />