Laserfiche WebLink
N/A. <br /> 4) Will the proposal require surface water withdrawals or diversions? <br /> Give general description, purpose, and approximate quantfties if known. <br /> NIA. <br /> 5) Does the proposal lie within a 100-year Floodplain� If so, note location on <br /> the site plan. <br /> NO. <br /> 6) Does the proposal involve any discharges of waste materials to surface <br /> waters? If so, describe the type of waste and anticipated volume of <br /> discharge. <br /> N/A. <br /> b. Ground <br /> 1) Will ground water be withdrawn, or will water be discharged to ground <br /> water? Give general description, purpose, and approximate quantities if <br /> known. <br /> NIA. <br /> 2) Describe waste material ihat will be discharged into the ground from <br /> septic tanks or other sources, if any(for example: Domestic sewage, <br /> industrial, containing the following chemicals: agricultural: etc.) <br /> Describe the general size of the system, the number of such systems, the <br /> number of houses to be served (if applicable), or the number of animals or <br /> humans the system(s) are expected to serve. <br /> THE PROJECT WOULD BE SERVED BY SNOHOMISH COUNTY <br /> PUD AND CITY OF EVEFicTf. NO WASTE MATERIAL WOULD <br /> BE DISCHARGED FROM SEPTIC TANKS OR OTHER <br /> SOURCES. <br /> c. Water Runo('(including storm water): <br /> 1) Describe the source of runoff(including storm water) and method of <br /> collection and disposal, if any (include quantities, if known). Where will this <br /> water flow? Will this water flow into other waters? If so, describe. <br /> N/A <br /> fORMIFt-05382-W1-8092A07 KLL PAGESOF 13 <br />