Laserfiche WebLink
!! <br /> � <br /> 8.1..4. � <br /> Ualeee otherwi�e indicsted, all materiala of recoverable value taken fzan the <br /> discarded fecilitiee shall be carefully salvaged and delivered to the Owner in <br /> Igood condition and in euch order of salvage a� the s�}#wee�owner's � <br /> Representative may direct. Materiale deemed of no value by ehe <br /> Sngia�eer-0wner�e Repzesentative ehall bc renaved by the Contraceor and become <br /> hi■ property to be di�po�ed of off the pzoject site. � <br /> All castinge and other materisls removed from the existing atilitie� vhich aze <br /> not ta be re-ueed elsewhere on the pzoject, and which, in the opinion of the <br /> � 6n9�nee�owner�e Repreeentative, are �uitable for salvage, ■hall h�ve exce�• � <br /> concrete, debrie and dirt removed �nd ehall be delivered to the location <br /> Idesigneted by the Swgir.ee�Owner'e Repreeentative. <br /> M��t� Di�po�al � <br /> The Contrac[or shell arrange to diepoee of warte �t nn expen�e to the City and <br /> any euch diepo�al ehall meet the zequirements of Section 4-03.3(7)C of the <br /> Standard Specificstione. � <br /> R�aov� A�l1ro�E Traek� <br /> The Contrector �h�ll remove railzoad track� and tfeo ae ehown in the Plr.n�. � <br /> The railroad tieo and tracke ehal7. becane the property of the Contractor and <br /> ehall be dirpored of ofY-�ite. The exitting roadway pavement, curb�, and <br /> other feature• disturbed by the removal ehall be immediately re�tored to a <br /> ueable condition. The re�toration vrork will be paid for at the unit contract � <br /> prices for the iteme involved. <br /> II�aov� Chain Link f�ao� � <br /> The Contrector �Aall remove and di�po�e of exi�ting chain link feace, <br /> including existing gate�, where �hown in Che Plan�. <br /> IN��ura�ne � <br /> Bid iteme of work completed pursuant to the Contract Documents will be <br /> maa�ured sa provided in Section 1-09.1, Me�surement and Payment, of the <br /> stand�rd Speoificationt, unla�• otherwise provided for by individu�l � <br /> meaourement peregraph� in this Section. <br /> 9aw cutting will not be mea�ured. All saw cutting �hall be incidental to the <br /> applicable removal or in�tallation item. � <br /> Mearurement for abaadon and fill pipe �hall be by the actual number of linear <br /> feet of pipe filled with material as d��ignated in the�e �p�cificationt. <br /> Removal of catch b��in, manhole, inlet, curb inlet, �ump�, and other dralaage ' <br /> etzuctures will be mea�ured pez each a■ abandon exieting maMole or catch <br /> baein. <br /> Removal of railroad tzack will be mea�ured per linear foot along the ' <br /> centerline of the exi�ting treck. <br /> Removel of chain link fence will be mea�ured along the line and •lope of , <br /> the exieting fence in place prior to renaval. Me��unment vill include <br /> gate openinge. <br /> Divieion 2 Page 4 ' <br /> 6werett Station OS/13/00 <br /> H:\Jobs\97093\TRANS\�G\SPECS\SDO�cd\S[reet site\9BSPEC2RI.doeG�J� <br /> 3D , <br />