Laserfiche WebLink
i <br /> i <br /> ray�nt <br /> Isection 2-02.5 ie replaced by the following: <br /> Paymeat will be made for auch of the following bid iteme ae aze included <br /> Iin the p�}eample Schedule of Valuee: <br /> �''Abandon Exiating Manhcle/Catch B��in^, per each. <br /> I i,�"Removing Miscellaneou� Traffic Item•, lump eum. <br /> 3� "Removing Railroad Track", per linear foot. <br /> �� "Removing Chain Link Fence", per linear foot. <br /> IThe unit contract price for ^Removing (Item) ^ or `Abandon (Item)^ ehall <br /> include all coete for the work required to completely remove and dispoee of or <br /> ealvage the item ae �pplicable. <br /> IRemoval of iteme not li�ted in the eid Form shall be coneidered aa incidental <br /> to the construction, and the coot• thereof �hall be included in ehe variou� <br /> Iitems compri�ing the improvemeat. <br /> /iCTIOIf 4-07 � <br /> IIt011D1q►7 J111D 92Tt iZGVATIOM 1NID � I <br /> Coa�lruccioa 1t�Quir�at� <br /> Section 2-03.3 ie eupplemented with the following: <br /> IBla�ting shell not be allowed. 8uitable excRvated material shall be u�ed for <br /> rwdway embankments, while �urplu� excevated material or un�uitable materi�l, <br /> if any, ehsll be di�po�ed of by the C.�nt:ractor. <br /> I Roadway and eite exca�•ation �hall include excavation, zemoval, hauling, and � <br /> di�po�al of all �urplu� ayterial whethez used for roadway fill or wa�ted. The <br /> �'�-�xcavation aree i• defined a■ the total work limit�, usually from � <br /> . right-of-way line to right-of-way line on eieher •ide of the roadw�y, and all <br /> erea� in-between, adju�ted a■ needed to encompa�■ the actual limies of the new <br /> improvemente. The intent i■ that the removal of all pavement�, curb�, <br /> ( gutter�, •idewslke, drivew�y�,and other fe�ture� outside the indic�ted <br /> pavement retention line• will be paid a� roadway and site exc�vation. � ' <br /> Side street e pp i <br /> I pproachet to the projecc and •treet a roache• at each end of the <br /> pzoject which are to be rempved, will al�o be p�id for a� ro�dway excavation. <br /> � Any exaavetion or embankment beyond Che limit■ indicated in the Plano, unle�� <br /> ordered by the Sngi�eefqwner�e Representative, will not be paid for, All wrk � <br /> and material required to return there areas to their original condition, as <br /> I directed by the 6wgi�eetOwner�o Reoresentative, ehall be provided by the I <br /> Contractor at hie aole expen�e. <br /> All areae ehall be excavated, filled, and/or backfilled a� neceesary to comply <br /> Iwith the gradee ehown on the drawinge. In filled and backfilled area�, fine <br /> I DSvi�ioa 2 Page 5 <br /> fiVeret[ St�tion - OS/12/00 I <br /> H:\Joba\97093\TRANS\fiNp\6P&CS\300�cd\S[reet eite\98SPEC2RI.docB*{FR�iC��e . <br /> I 3� j <br />