My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3201 SMITH AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
SMITH AVE
>
3201
>
BASE FILE
>
3201 SMITH AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 3:55:13 PM
Creation date
3/9/2017 9:33:51 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3201
Tenant Name
BASE FILE
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i1 <br /> �� <br /> gr�tding ehall begin within the final 6" of fill. Final yt <br /> grading �hell produce <br /> a ��urface which i■ emooth and even, without abrupt change� in grade. � <br /> Contractor �hali provide temporary drainage to keep the �ubgrade free from <br /> �tanding water. <br /> The snbgrade ehall be free from rooka or cemented lumps larger th�n 2�^ in a <br /> greate�t dimension, in the top 6". <br /> Bxcav�tion for curbs and guetere •hall be accompliehed by cutting accurately � <br /> to the cro�s-eections, gradee, and elevations ehown. Care •hall be taken not <br /> Co excavate below the epecified gradea. The Contractor ehall maiatain all � <br /> excavation� free from detzimental quantitiee of leavee, bruoh, •tick�, tra�h, <br /> and other debrie un[il finel �cceptance of the work. <br /> There will be no separate payment for haul on any material moved within or <br /> from the project eite and the Contractor ehall include the co�t of h�uling in � <br /> his varioue unit contract pricee. <br /> Acceptable excavated native soils •hall be u�ed for fill in the area■ t <br /> requiring fillo. Care ehall be taken to place excav�ted matezial at the <br /> optimum moi�ture content to achieve the �pecified cc�action. Any native � <br /> matezial u�ed for fill �hall be free of organice and debri• and h�ve a maximum <br /> perticle eize of 6". Matezialr which become ��tuzated ehell nor be u�ed for <br /> fill uneil the moieture conteat of the fill meet■ che requirements of Section <br /> 2-03.3 (14)C and 2-03.3 (1�)D. � <br /> It will be ehe respon�ibility of ehe Contractor to prevent the native <br /> material• from becoming ratureted with water. If the native material• become � <br /> •�turated, it will be the ze�pon�ibility of the Contrector to dry the <br /> m�terial�, ee hi• expen�e, to the optimum moi�ture coneant. My delay� as • <br /> re�ult of having to dry the material will not be ceu�e for �dditionel time or <br /> money. ' <br /> Ithere native materiale �re unacceptable for rwdw�y fill, unle�s otAerwi�e <br /> � directed by the Sngi�pwner�e Repre�entative, or �hown in the Plans, the � <br /> fill material •hall be gravel borrow a� �pecified in Section 9-0].1� of the�e <br /> 8pecial Prwioions. aravel borrow will be paid for �epsrately, per ton. The <br /> price per ton �hall include the cott of hauling and plaeing the ma[erial in <br /> lift• ae specified herein. t <br /> � Compaction of embankment --�•.:o•T�� �terial,e whether native cr impozted_ <br /> �h�ll be incidental to the fill material items. � <br /> i�cca��tioa 1�lov Orad� <br /> Section 2-03.3(3) ie eupplemented with the following: <br /> Following removsl of top�oil or excavation to grade and before placement , <br /> of fille or bare cour�e�, in driving area�, the �ubgrade under the <br /> roadway/parking lot ■hall be prcpf rolled to identify any •oft or loo�e ' <br /> are�s where the subgrade ha■ been di�tuzbed and/or where the density of <br /> Divieion 2 <br /> Pag! 6 , <br /> Bverett Station OS/1�/00 <br /> H:\Jobe\97093\TRANS\ENG\SP6CS\100tcd\Street site\983P6C4RI do <br /> - 3Z ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.