My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3201 SMITH AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
SMITH AVE
>
3201
>
BASE FILE
>
3201 SMITH AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 3:55:13 PM
Creation date
3/9/2017 9:33:51 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3201
Tenant Name
BASE FILE
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> ,� <br /> �5 <br /> i <br /> At the ■tart of paving, the Contractor mu�t demonetrate to the <br /> � �oWner�s Repreeentative ehat the mix ;e ccxnpactible by � <br /> con�tructing campactioa te�t •ectioa(a) . Test •ection(a) �hail be <br /> conetructel ueing the compaction tzain and a v�riety of rolling pattera� <br /> that the Contractor expecte to u�e in ehe p�ving operation. A te�t <br /> eection vill be con�ide:ed to have e�tabli�hed compactability, ba�ed on T <br /> Che reeults of three den�ity determinatione, when the average of the 1 <br /> ehree teste exceede 92t of Rice or when all three teete individually <br /> exceed 91t of Rice. This will require coaoideration of the pre�ence of <br /> a �orrelation factor for the nuclear gauge and may require final T <br /> re�olntion after the factor for the �3auge is known. A minimum of 1.00 j <br /> compactlon pay factoz eh�ll be ueed until r gauge correlation fantor i• <br /> known, and until the mix ie coneidered compactible. When con�truction <br /> of the teet section(�) hae demon�trated that the mix i■ aot compaotible, T <br /> peving mu�t etop. To re�ume paving, all factors contributing to j <br /> � compaction ehell be enalyzed end swg�nee�pwner'g Repreeentative approved <br /> change■ made, which may require a new mix de�ig.1. iihen paving i• <br /> re�umed, ehe Coneractor mu�t again, ,.a previou�ly defined, demon�trate T <br /> that the mix io compactible. If t4e Contractor dx.9 not construct te�t 1 <br /> �ection(e) , r:�e mix is con�idered co�actible and all mix placed will be <br /> evalueted according to Section 5-01.3(10)B. � <br /> Aephalt concrete Cla��an A, B, B, F �td 0 con�tn:cted under coadition� <br /> other than lirted above �hall be con�actec' on t'.�e bssi• of a ta�t point <br /> evaluation of the co��ction train. The teat Taint evaluacion �hall be T <br /> I perfotmed in accord�nce wiih in�tructioa. from the Sn93nee�Ovr�er•s � <br /> Repreeeneative. The n+::,�oer of pa��e• with an approved comp�ctioa train, <br /> required to attain cee maximum t��t pc�int density, �hall be u�ed on all <br /> •ub�equent paving. T, <br /> A�ph�lt wn.-rete C�n�e D �nd prelevuling mix �hail be compac[ed to the — <br /> � tati�fa�:tion of the �pvmer�s Reore�ent�tive. <br /> In add:ition '.o the randomly ■elected loc�tione for tee[• of the contral � <br /> � ?ot, t;u &xg#aaetOwner�e Repreeentative rerervee the right to teot any <br /> •rea wl�ich appear� defect ve and to r�quire the further compactlon of <br /> area� ch�c fall below acceptable den�ity reading�. 2heee edditional � <br /> te�t■ ehell not impect the compact:on evaluation of the entire control <br /> lot. <br /> Joint� � <br /> Section 5-04.3 (li) ia ■upplemented with the following: <br /> Immediately following the compaction of the top wearing courte, meet <br /> line joints where the new asphalt concrete ebute existing a�phalt � <br /> concrete p�vement�, portland cement conczete pavement�, oil nrtr, <br /> concrece cuzbe and gutter, etc., �hall be ■e�led with STB-1 asphalt. <br /> Meet lines ■hall be �ealed w`iile the aer asphalt concrete i• �till waxm <br /> by painting with Speci�l Tack Coat (STfi-1) a�phalt and immediately ' <br /> covering the a�phalt paint ■tzip with clean, dry paving s�nd nieeting the <br /> requirements of Section 9-03.!(4) . Thi• work �hall be considered <br /> incida:tal �� the a�ph�le concrete pavement work. <br /> luph�lt Coacr�t� Approaeh ' <br /> 3ection 5-04.3 (15) is replaced with the folloring: <br /> Nhere tAe exi�ting a�ph�lt eonerete drivewaya amst be removed Sn order to , <br /> allow conetruction of the new roadway or vhere new a�phalt concrete <br /> drivevaye are indicated on the draw•ings or a� directed by the <br /> Divieion 5 <br /> IE�erett siation page 2 ' <br /> H:\Jobs\97093\TRANS\&Np SPfiCS\100\cd\S[reet •Ste 985PECSRI.doc OS/12/00 <br /> - Gz � . <br />
The URL can be used to link to this page
Your browser does not support the video tag.