Laserfiche WebLink
� <br /> � <br /> 11qid Pip� <br /> Unlese otherwise �pecified on the drawing oz dizected by t6e � <br /> � �+y#ne�owner•s Representative, pipe :one material for rigid pipe ahall <br /> be "Sverett No. 2 Ma�hed Coar�e S�nd^ per Section 9-03.12 of the�e <br /> 8pecial Provisione. <br /> The pipe zone material �hall be plaaed to a depth of at least 12" over � <br /> the top of the pipe and 6• under the pipe. The pipe zone mater�al �hall <br /> be ramned and tamped around and under the pipe by the u�e of �hovel• or ** <br /> other approved hand-held tool�, ■o as to provide fixm and uniform � <br /> �upport along the full length of the pipe, valve� and fitting�. Care <br /> �hall be taken to prevcnt any demage to the pipe or it• protective <br /> coating. � <br /> �acklillioq Tr�nch�� <br /> Section 7-10.3(10) ie supplemented with ehe followiag: � <br /> � Unlese otherwite directed by the sngifleefOvnei�•s Repreaentative, <br /> controlled deneity fill �hall be u�ed foz fill above ehe pipe zone for <br /> water mainr in all paved •traet �ection�. � <br /> Controlled Deneity Fill �hall confozm to ehe requirement� of Section 2- <br /> 09.3(1)S of the standard Sp�cification�. <br /> � The sn9�Fowner'e Repreaentative may authorize ehe u�e of gr�vel � <br /> borrow or ■uitable native material in non-paved are��. <br /> Compection of trench material• �h�ll be acco�liohed using machine � <br /> operated mechanical caaipaction or h�ad operated machanical compaction. �. <br /> . <br /> 1Ma�urwn! �nd P�yMnt <br /> Section 7-10.� and 7-10.5 are �upplemented with the following: Yj <br /> � <br /> N�li_i__� �.. ..�.� �_ � <br /> i <br /> Measurement and a � <br /> p yment for "8horing or 6xera Szcavation Cla�� e,^ per <br /> square fuot, �hall confotm to ehe requirement• of Section 2-09.4 and 2- <br /> 09.5 of the Standard Specification�. � <br /> Payment will be made in �ccord�nce rith 8ection 1-04.1, for e�ch of the <br /> � following bid iteme when included in the pregee�}Schedule of Values: � <br /> •B�nk Run 6ravel for Trench Backfill•, per cubic yard. <br /> � "Controlled Den�ity Fill-{6pF�•, per cubic yard. <br /> •tCTI01� 7-11 ' <br /> PIPi IM/TALL�TION 101 NA'Pilt WI�t/ <br /> O�a�r�l ' <br /> Section 7-11.1 ie aupplemeated with the following: <br /> Divi�ion 7 Page 12 � <br /> Bverect staeion os/12/o0 <br /> H:\Jobt 97093\TRANS\&NG\SPfiCS 100fc \Stt!!t ■ite\98SPSC7RI.doc �i�a�IFWW�A . <br /> l$�j <br /> ' <br />