Laserfiche WebLink
� <br /> � <br /> Nater maine �hall be laid to provide a miaimum cover over t6e pipe of <br /> I 36^ under finished grade, unles� iadicated otherwi�e on the draring� oz <br /> apprwed by the Sngixeefpwner�s Representative. � <br /> Coa�tructiou 1t�quirwat� <br /> ISection 7-11.3 is supplemented with the following: <br /> L�yiaQ ot Dip� oa C1irw� <br /> Section 7-11.3f�) is supplemented with the following: <br /> IThe maximum deflection of "Mechanical-Joint^ pipe and ^Push-on <br /> Joint^ pipe ehall not exceed that called out in Section 5.8.1 of <br /> I the City of Everett De�ign and Conttruction Standerde and <br /> Specifications. <br /> fxpan�ion Joint I <br /> I �anaion ioint shr,ll be B"x8^xla^ Redflex NSF rade 'fype J-1 Triple <br /> Arch Expaneion Jo�.nt C/W control rods or approved equivalent. <br /> Conn�clion� to fxl�tinq ltaiaa <br /> ISer.cion 7-11.3(9)A ie aupplemented with the fullowing: <br /> Only City Utilitie� Divi�ion per�onnel �hall makt the physical <br /> connectionc between new and exi�tiag mains. Coanection to the <br /> I exi�ting mein ehell not be allowed until after the naw main ha� <br /> been inotelled, hydro�tatically te�ted, dioinfectad, fluched and <br /> authorized by the SegiwaerOnr�er's Repreaentative. City approved � <br /> double-check valve as�embly required for flu�hiag and te�ting <br /> ehall be used by the Contractor. <br /> Tappiag sleevee �hall confozm to t6e requirement• of Section 9- <br /> 30.3 (8) of ehe�e 8pecial Provi�ion�. Prior to ordering tapping <br /> I •leeve�, ehe Contractor �hall meet wieh and di�cu�• ehe ozder with <br /> the City conotruction in�pector and water dep�rement <br /> repreeentativee. <br /> I Unle�• otherwi�e �pecified, the Cbntractor �hall perform all the <br /> excevation� and �horing required to •llow the city par�onnel to <br /> make the final cotutection batween ehe exi�ting and new mains. The <br /> new main� �hall be aliqned with ehe exi�ting nrin� �o the <br /> I connection can be made in a •traigh[forward auaner without further <br /> alignment changes. 7Wy adiu�tment• required will be made by ehe <br /> Contr�ctoz. The Contractor will �upply all otder material• and <br /> I labor required for the final connection, including bnt noc limited <br /> to valves, spools, flange�, backtill, campaction and re�toration. <br /> Couplings ehall be ductile iron, aleeve eoupling�, NJ x MJ as <br /> maaufactured by Mueller or M 4 H, or approved equal. <br /> The Contraetor �hall give the City Utilities Divi�ion at lea�t 48 <br /> houro notice for each connection. The eity per�onnel �hall not <br /> enter any excavation not �hored in conEormance with the <br /> I requirements of NISHJI, RCYI 4?.17 ineluding NAC 296-155. <br /> � aydso�Gatic Pt���ur� T��! <br /> Section 7-11.3 (11I i• �upplemented with the following: <br /> It ehall be the Contracior�s re�pon�ibility to provide an approved <br /> double-check •��embly !or rhe purpo�e of te�ting and flu�hing. <br /> There will be no charge for the water u�ed in thi• ration. <br /> Divieion 7 Page 13 <br /> fivezect stacion — os/12/oo ( <br /> � H:\Joba\97093\TRANS\ENG\SPECS\SOO�cd Street site\98SPEC7RI.doc <br /> A�p��}} � <br />