Laserfiche WebLink
, <br /> ► Antiapated Schcdule: <br /> � 1'ttGminuy En6ineering Au6ust 1998 through February 1999 <br /> Final Engncering March 1999 through Au6ust 1999 <br /> Bidding a[ Negotiuion Septe.nber 1999 <br /> Consttvction Ottober 1999 through August 2000 <br /> Opeaing August 2000 _ <br /> Recommrndaaom: <br /> The following should be considered: <br /> . Private sec[or managemen[ of the station to minimiu opention md <br /> mtintenance costs. <br /> • A transit-oriented development (TOD) zoning 'overlay" dis[ritt to help <br /> target and encounge specific development. <br /> . A marka midy for new uses including live/�vork utis ho�uing and <br /> other uus compatible with exisiing industrial uses in the ua. <br /> . Additional pedestrian enhancemenrs to streeu ia che uea in addition to <br /> those included wi[hin the stacion site to provide connec[ions to <br /> downtown, [he riverfront, and neighborhoodt. <br /> • Coordina�e the Sound Truuit overpus project concurrently with the <br /> stauon to contribute �o che unique identity of the station arca, prcserve <br /> options, achieve efficiencies, and nduce construttion impacu. <br /> 9� <br />