Laserfiche WebLink
March 30,2009 <br /> IIWA Project P;o.2009-030-21 <br /> • Pnvement,material testing; <br /> • Foundation beuring capacity vcrification; <br /> • Structur�l fill pinccmc��t; und <br /> • Utility trcnch buckfill. <br /> i '1'l�c locations of U�c explmutious used Cor this project were limited lo exisung datu. It is <br /> ,. : <br /> � possible thal subsurface c.onditions in other areas dilTer signiftcantly from thosc revcalcd <br /> in thc cxisting explorntions. By bcing present on-sitc duririg'the conslruction phase of the <br /> project,our rcpresentativc will be ublc to confirni conditions indioeted.by thc <br /> explorations,verify the applicability of tlie recommendatioiis prescnted�in this report <br /> Uascd on thc soii conditious cncountcred,or,if ncccssary, provide revised <br /> recommendations ndapted to lhe conditions revealed during construction. • <br /> 4. CONDITIONS ANU LIMITATIONS <br /> � <br /> Wc havc prcpurcd this rcport for thc City�qF L'vccctt and.PcRect Inc. for their use in <br /> designing and construction of the Noi�theni,S}viR DRT Transit Teiminal. 'I'his report <br /> should be provided in its cntirety to prospective contmctors Cor UiJding and estimating <br /> puiposes;howevcr,lhc conclusions und iutap�etutions presented in this reporl shouid not <br /> be consU�ued ns a wm•ranty of ezisting subsurfaCe.conditions. Experiencc hus sho�yi tl�at <br /> soil smd ground watcr conditions can vary significantly ovcr small distnnces nnd <br /> grnunc9water can vnry significmuly over tima Inconsistent conditions can occur between <br /> exploraticin locatious and'may not Ue detected by n geotechnical study of lhis nature. If, <br /> during future sitc operalionst subsurAice conditions m•c encounlered which vary <br /> apprecinbly from tliosc described herein, EIWA should be notified for rcvicw of thc <br /> nncommcnd,itioiiS of this rcport, nnd revisiott of such if ncccssary. <br /> SufTicicnt gcotcchnicnl mouitaring,tcsting,nnd consultutiat should be provided during <br /> coustivction to confimi that the condilions encountered are consistent with thosc <br /> iudicated hy tlie explondions, lo provide recommendutions for dcsigu cl�anges sliould <br /> conditions revcalcd duriug construction differ substantially from lhose anticipated,and to <br /> verify thnt geotechnical aspects of construclion camply with thc contruct pinns ar.d <br /> spccificutions. <br /> Witltiu tlic limitations of scopc,schcdulc and budget,HWA attempted to execute these <br /> services iu nccordance with genernlly accepted professionnl principlcs and practiccs in thc <br /> ficlds of gcotechniud cuginecring mid enginccring gcolugy in the area ut lhe lime the <br /> 2G09�0?0-21 Drallwa 1$ HWAGEOSCIkNCFSINC <br /> 1 �, <br />