My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3817 SMITH AVE 2016-01-01 MF Import
>
Address Records
>
SMITH AVE
>
3817
>
3817 SMITH AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 10:39:15 PM
Creation date
3/9/2017 10:38:44 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3817
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> 3 . . <br /> t <br /> 7 . .._. __ �....`..�_,.____.c-, <br /> ; _ . .""'""""_'_. ._ __._..._. _. _ . . <br /> ..._.��... .._. _ ".____" _ <br /> y _ ._.�..._ _. -... <br /> To Bob Landles, Planning Department • .::, <br /> FROM Public Works Department �" _ .. � <br /> c,,_., <br /> DATE <br /> SUBJECT �E.P�A. Checklist Review # 80-78 �ITY OF EVERETT,EVERETT WASHINGTON . . <br /> PROPOSAL: <br /> � <br /> Issuance of grading and bui_ld�na oermits to allow the , <br /> construction of an 8,000 square foot ����g$X�xz3�asgx <br /> � warehouse at 39th and Smith <br /> �' RECOMMENDAT10N5: <br /> it is the recommendation of the Public Works nepartment that issuance of a Negative <br /> ' peclaration be subject to the foliowing: <br /> ' 1. A detailed drawing shall be submitted to the Public Works Department showing . <br /> parktng layout, landscaping, driveways, utilities, storm drainage, and all required <br /> Improvements to the public rlght-of-way. Public Works Department approval <br /> of these drawings is required before any permits are issued. All improvements <br /> shall be completed before the Occupancy Permit is is�.ied. <br /> As-builts,easement,ar,d a one year Warrantee Bond in the amount of !0%oi <br /> the rnst of construction of the public water system are required within 10 working <br /> ! days of obtaining public water connection. <br /> 2. City streets are to be kept clear of dirt and debrls during construction. <br /> - 3. During construction, all truck traffic to and from the site within the City of <br /> Everett shall be on arterlal streets unless otherwise approved by the Public Works <br /> DepartmenL <br /> Partici in th ost to f x <br /> � t tor is require . � <br /> ,� 5. On-site detention is�e�quired. A temporary erosion and sedimentation tontrol <br /> i, plan must be approved by the Public Works Department before any cleari�8, <br /> ! grad[ng or cther site preparation can begin. Drainage calculations to be subm[tted <br /> j on City Drainage Plan submission form. Res ding of exposed earth ls requlred <br /> { wlthin 30 days of completlon of earth work. �se�. z'. �--� <br /> �, ;, ( 6. A preconstraction coni_rence on CIvII Engineering portlon of projectls required <br /> � prlor to appro�•al of Public Works Permit. The applicant shall arrange meeting <br /> r involvit�g applicant, job superintendent, contractor, all subcontractors,Fire <br /> Publ'caWorlks Coordtnator,nPubl c Works Inspector,nand C[ty Traff c Engineer.� <br /> P.MEND CHECKLIST AS FOLLOWS: <br /> ''��' II-13 a, b, c, d, and f - change to yes. <br /> 4 INFORMATION FOR DEVELOPER: <br /> 1. A fire hydrant is required within 200 drtving feet but not closer than SO feet <br />, of every structure. <br />' _ _ . . . .. --- <br /> , , ' , ' . <br /> � , ' c .. . , , . • �� . . . ". ._ <br /> ! <br />
The URL can be used to link to this page
Your browser does not support the video tag.