Laserfiche WebLink
, , ( ( <br /> DETERIIINATION OF NON-SIGNIFICANCE <br /> SEPA N18-89 <br /> DESCRIPTION OF PROPOSI►L: The proposed action is the issuance of <br /> Building and Public Works permits to allow the construction of a <br /> 4 ,560 sf warehouse and office building for Rogers Electric (900 sf <br /> of office space and 3 ,360 sf of warehouse. <br /> PROPONENT; gen Newland <br /> 2911-1/2 Hewitt Ave. a�CCIVED <br /> Everett, WA 98201 <br /> �qr <br /> ,...�a o; ;_: ; <br /> I.00ATION: northwest corner of 39th and Smith St. <br /> EEN t;�1;L���p C0. <br /> Lead Agency: City of Everett Pianning Dept. <br /> Contact Person: Mary Cunningham Phone: 259-8731 <br /> Mitiaa*ion Measures• <br /> The environmental impacts of this proposal are documented in the <br /> Environmental Checklist and other information on file with the City. <br /> The listed requirements are placed in response to our review of this <br /> information: <br /> lIITIGATION OF ADVERSII IIdPACTS BY SEPA <br /> 1. Any grading/fill on this site shall be done so as to not impact <br /> the surrounding properties. (SEPA Earth, Land and Shoreline <br /> Use Policies) <br /> 2. Screening of all outdoor refuse disposal areas must be <br /> provided so that they are not visible from adjacent properties <br /> or public rights-of-way, The disposal areas must be shown on <br /> the site plan submitted for building permits. (SEPA Aesthetics <br /> Policies) <br /> FIITIGATION REQUIRED BY EXISTING CODES AND ORDINANCES <br /> 1. Full standard street improvements are required to the north <br /> side of 39th Street on the proposal�s full frontage, including <br /> curb, gutter, sidewalk, and drainage control per Ordinance <br /> 555-78 as amended. (SEPA Transportation Policies) <br /> 2. Installation of sidewalk behind the existing curb on Smith <br /> Street is required, including a wheelchair ramp at the <br /> intersection per Ordinance 555-78 as amended. (SEPA <br /> Transportation Policies) <br /> 3. The fire flow requirement for this building is 1,750 gpm. <br /> Adequate fire flow must be verified and provided to the site if <br /> � the current fire flow is not adequate. (SEPA Public Services <br /> and Utilities Policies) <br /> �� <br />