My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
400 SMITH ISLAND RD 2018-01-01 MF Import
>
Address Records
>
SMITH ISLAND RD
>
400
>
400 SMITH ISLAND RD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 10:57:02 AM
Creation date
3/9/2017 11:08:26 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH ISLAND RD
Street Number
400
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Mac�eod Rec�ord <br /> �ar,c�A�cr,�t�cc� <br /> b„37mdheE� <br /> S�tld��qtn98tY <br /> a76323799 <br /> April 20, 1990 <br /> Everett Parks & Recreation <br /> Foresc Park <br /> 3002 Wetmore <br /> Everett, WA 98201 <br /> Attn: Clyde Haglund <br /> Re: Langus Riverfront Park Public Works 100% Review Comments. <br /> Dear Clyde, <br /> � As we discussed on the phone this week I have not been able to locate the <br /> Langus II working drawing set containing Public Works' comments. I do have a <br /> � memo in my file which lists the comments and our response to them. Theo has <br /> reviewed many of the issues with Public Works in regard to projec:t phasing and <br /> our inability to accompiish all of their requested improvements within the <br /> scope of this project. Following is a list of their comments and our response: <br /> I . GENERAL <br /> A. Inspect and possibly replace tidegates where construction or <br /> improvements overlay existing island drains. <br /> Response: Not within project scope, per Theo Mittet. <br /> B. Inspect island drains prior to contract and replace if necessary <br /> during construction, wherever improvements overlay existing island <br /> drains. <br /> Response: Not within project scope, per Theo Mittet. <br /> C. Bike path should extend tc Public Works trail . <br /> Response: The master plan provides for this connection, however it is <br /> not within the project scope to provide that connection per Theo Mittet. <br /> D. Where is the salvaged metal building from the WWTP to be relocated? <br /> Response: lt will be located in the same general area just east of I-5, <br /> as is shown for the maincenance building, on the Langus Riverfront Park <br /> master pian. <br /> E. Add north arrow roadway names and label river on all plan sheets. <br /> Response: Will comply. <br /> F. Locate known existing utilities on plans. <br /> Response: Will comply. <br />
The URL can be used to link to this page
Your browser does not support the video tag.