My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
400 SMITH ISLAND RD 2018-01-01 MF Import
>
Address Records
>
SMITH ISLAND RD
>
400
>
400 SMITH ISLAND RD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 10:57:02 AM
Creation date
3/9/2017 11:08:26 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH ISLAND RD
Street Number
400
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. SHEET BY SHEET COMMENTS <br /> A. Cover sheet - location map shows work extending to I-5 bridge? <br /> Response: This map is to assist the Contractor in finding the site and <br /> is not meant to define the limits of work. <br /> B. L-1 - A 4' yravel shoulder should be provided on both sides of the <br /> relocated roadway around the proposed boathouse. <br /> Response: This is a temporary relocation on park property and Parks <br /> Department would prefer to see grass at the edge of pavement over a firm <br /> base material . <br /> C. L-3 - Install floatable material separators per City standards <br /> Response: Will comply. <br /> D. L-4 - Show new 48" outfall piping and diffuser, 10' diameter manhole <br /> and vault where it crosses the wate'•front trail and coordinate <br /> pavement grades. <br /> Response: Will comoly• <br /> E. L-5 <br /> 1. Water pressure is very high in this location. PUC should not <br /> be used. Civil engineer's stanp is requireA. <br /> Response: A PRV will be included. Phase I park development used PUC <br /> pipe. Pressure specificatio�s fer piping will not be exceeded. <br /> Landscape architectural , architectural , civil engineering or structural <br /> engineering stamps are provided as required. <br /> 2. Backflow prevention required on irrigation system prior to <br /> acceptance and operation. <br /> Response: Phase II irrigation is an extension of Phase I existing system <br /> which is equipped with back flow preventer. The boathouse water service <br /> will require protection in the future when additional irrigation is <br /> connected to this line. A 2" blow out will be provided at the capped end <br /> of this line in Phase II. <br /> F. L-6 <br /> 1. Backflow prevention required on irrigation. <br /> Response: See response to comment E.2. above. <br /> 2. Move irrigation main line from under riprap. <br /> Kesponse: Will comply. <br /> To the best of my knowledge the above list represents the comments on the <br /> marY.ed up set of Public Works revieo� drawings sent to us on January 30, 1990 <br /> by Larry Crawford. <br /> Sincerely, <br /> ����� C <br /> Ed MacLeod <br /> Principal <br /> EM:kc <br />
The URL can be used to link to this page
Your browser does not support the video tag.