My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5302 SOUND AVE 2016-01-01 MF Import
>
Address Records
>
SOUND AVE
>
5302
>
5302 SOUND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 9:26:40 AM
Creation date
3/9/2017 11:35:10 PM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
5302
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 IN'PRUDUCTION <br />Timber Crest Consuuction ComPanY ro4��s� C�� G0°��'�� �"�� �O• COnduct a <br />geotechnical invesdgation at the projxt site, located in Eve'stt, WashinBton. Tlus report <br />summarizes the findings of our field investigation, presa�ts Beoteclwcal �°nclusions, and <br />provides pnlimu►uY ra°mmendadons for stabiliztng the ex�snne residena. Authorizadon to <br />p��d wi�h this project was by signed contract, datod July 25, 1994. As indicated below, we <br />should be enBaBed co Teview your final plans tq pmvido final I°�°mmendations at that dme. <br />2,p pUItPOSE AND SCOPE <br />The purpose of this gootochnical study was w investiQate the subsudace soil and �roundwata <br />conditions in ti�e srea of the residena in order to formulate conclusions and provid^ preliminary <br />���echnical rxommendarions for stabilizit►C th� exlsdng suucture• <br />�h� xope of work for this study included a field i�►�Bation, a review of informatiee in �t <br />llbrnry fmd files, and the pnparadon of this gootochnical report. The field investi�adon <br />consistod of a visnal aite cxonn��'a� �d COmpledon of sia (� DY�c Cone Peoetradon <br />Tats (DCP'T) soil probes md three (3) Muld StaPe Samplct (MSS) test borin�s. Our <br />�eotechnical a►gincering report addressss the site's surfacx end subsurface soil and �cound watet <br />condidons, and provides conclusions and recommendations for beazin6 so►1 ele."'P.don below <br />�stna gcade� remafial foundaaon support methods, and considerations of slope stability end <br />erosion control• <br />We understas►d the owners plan to romain in the hou � udy wasl l m ted to the evaluaaon�of <br />�� �ama�ed portion of the house. Accordingly, <br />eacpedient cotrective measures. <br />3.0 PROJ�T DESCRIPTIUN <br />put unAerstei►ding of the projeot was baud on c°nversations with yoa• W� undetstand ttwt <br />
The URL can be used to link to this page
Your browser does not support the video tag.