Laserfiche WebLink
January 28, 2010 2 093-93256 100 <br />■ Seclion 4• CONSTRUCTION SCHEOULE AND BMP IMPLEMENTATION. Thls <br />describes the liming of BMP �mplementation m relation to the projeG schedule. <br />■ Sedlen 5- POLLUTION PREVENTION TEAM. This section identifies the contact names <br />(emergency and non-emergency), monitormg personnel, and the on-site Certified Erosion <br />and Sediment CoMrol Lead. <br />■ Seclion 6— SITE INSPECTION AND MONITORING. this sedion discusses the <br />mspection ard monitonng requirements mcluding frequency and documentalion. <br />■ Section 7— REPORTING AND RECORDKEEPING. This seclion describes fhe <br />requiremenis for documeNation of the BMP implementation, sile inspections, monitori�g <br />resWts, and changes to the implementa6on of BMPs due to site hictors experienced <br />during construction. <br />o�:e�wmyu �0�1�:.ttoa�o� <br />