Laserfiche WebLink
January 28, 2010 4 093-93256.100 <br />Stormwater runoH flows across the cap via sheet flow and in the ditches channel Ilow to the west outlets. <br />Caiculated peak tlows in the perimeter ditches are aboul 1.8 cfs, 3.1 cfs, and 52 cfs, tor the 2-year, <br />70•year, and tOD-year, 24-hour slorm events, respedively. A minimum freeboard of at leasl 1 foot is <br />provided. <br />Construdion adivities are anticipated to occur during the dry seasons benveen April, 2010 and <br />November. 2011. No earthwork achvities will be peAormed during the wet season (October t to April 30) <br />of edher year. <br />O1:P�P: n pa tJavrsw,cpn» <br />F Golder <br />Associates <br />